scholarly journals Optimal Frequency stability Control Strategy for a Grid-Connected Wind/PV/FC/BESS Coordinated with Hydroelectric Power Plant Storage Energy System Using Variable Structure Control

2021 ◽  
Vol 1 (4) ◽  
pp. 1-7
Author(s):  
Adel Elgammal ◽  
Curtis Boodoo

Because of the growing nonlinear and complexity nature of microgrid systems for example battery energy storage systems, wind-turbine fuel cell, photovoltaic, and micro hydro power plants (BESSs/FC/WT/PV/ Micro Hydro), load-frequency management has been a difficulty. The development of a load-frequency controller based on Proportional–Integral–Derivative (PID) for an autonomous microgrid (MG) with hydro, wind, and PV RES is shown in this article. The suggested LFC goal is to retain the frequency of the micro hydro power plant under variable load situations by controlling the sharing of output power constant generator between the dummy loads and consumer. Using an adaptive fuzzy logic controller to govern nearly the generating unit`s whole operation, the suggested control technique optimally chooses PID settings for each load value. The suggested fuzzy logic-based controller regulates the plant's frequency output despite fluctuating user loads and manages energy distribution by separating the micro network into separate departures connected in priority order. The suggested frequency controller uses a centralised LFC approach centred on a combination of smart load and Battery Energy Storage System to manage the MG frequency (BESS). It regulates MG frequency by providing active power balancing for a variety of events that such systems face in real-world settings, such as energy surplus generation and energy shortage. In Simulink/MATLAB, the suggested structure is simulated. The simulation results clearly demonstrate the proposed frequency controller's ability to dump extra power when the customer load varies while maintaining a consistent supply frequency.

Author(s):  
Maheswar Prasad Behera ◽  
Pravat Kumar Ray

Abstract The feasibility of integration of Battery Energy Storage System (BESS) with a three-phase AC grid is being investigated in this paper. A converter is an inevitable part of a modern DC generating system. The link between the grid and the BESS is established through a Voltage Source Converter (VSC). Therefore, the converter can be utilized to dispatch the DC generated power to the connected AC grid and at the same time provides reactive power compensation and load harmonic compensation throughout the day. The DC bus voltage control of the converter system is carried out to keep the power factor always at unity, irrespective of the charging state of the battery source. The charging and discharging of the connected battery energy storage system are carried out through a bidirectional DC-DC converter. Adaptive hysteresis band current control (AHCC) scheme is employed to produce the switching signals. Finally, its performance is compared with the traditional hysteresis band control technique.


Author(s):  
D.V.N. Ananth ◽  
G.V. Nagesh Kumar

In this paper, enhanced field oriented control technique (EFOC) was adopted in Rotor Side Control (RSC) of DFIG converter for improved response during severe faults. The work is intended to damp pulsations in electromagnetic torque, improve voltage mitigation and limit surge currents and to enhance the operation of DFIG during voltage sags. The converter topology uses a battery energy storage system with capacitor storage system to further enhance operation of DFIG during faults. The battery and capacitor system in coordination provide additional real and reactive power support during faults and nearly constant voltage profile at stator and rotor terminals and limit overcurrents. For EFOC technique, rotor flux reference changes its value from synchronous speed to zero during fault for injecting current at the rotor slip frequency. In this process DC-Offset component of flux is controlled, decomposition during overvoltage faults. The offset decomposition of flux will be oscillatory in a conventional FOC, whereas in EFOC it will damp quickly. A comparison is made with proposed methodology with battery energy storage system and a conventional system. Later the system performance with under voltage of 50% the rated voltage with fault at PCC during 0.8 to 1.2 seconds is analysed using simulation studies.


2018 ◽  
Vol 10 (5) ◽  
pp. 1645 ◽  
Author(s):  
Naowarat Tephiruk ◽  
Weerawoot Kanokbannakorn ◽  
Thongchart Kerdphol ◽  
Yasunori Mitani ◽  
Komsan Hongesombut

Sign in / Sign up

Export Citation Format

Share Document