scholarly journals Extended Economic Production Quantity Models with Preventive Maintenance

2019 ◽  
Vol 0 (0) ◽  
pp. 0-0
Author(s):  
Hadi Mokhtari ◽  
Javad Asadkhani
2016 ◽  
Vol 2016 ◽  
pp. 1-9
Author(s):  
Qi Xu ◽  
Jianteng Xu

This paper proposes an economic production quantity problem with the maximal production run time and minimal preventive maintenance time over a finite planning horizon. The objective is to find the efficient production and maintenance policy to minimize the total cost composed of production, maintenance, shortages, and holding costs under the restriction on the production run time and the preventive maintenance time. The production and maintenance decisions include the production and maintenance frequencies and the production run and the maintenance time. The variability and the boundedness of the production run and maintenance time make the problem difficult to solve. Two heuristic algorithms are developed using different techniques based on the optimal properties of the relaxed problem. The performance comparison between the two algorithms is illustrated by numerical examples. The numerical results show that, for the most part, there exists a heuristic algorithm which is more effective than the other.


2017 ◽  
Vol 10 (3) ◽  
pp. 431
Author(s):  
Xuejuan Liu ◽  
Binrong Wang

Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model.Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions.Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works.Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.


2006 ◽  
Vol 2006 ◽  
pp. 1-5 ◽  
Author(s):  
Yung-Fu Huang

Chiu studied the effect of service-level constraint on the economic production quantity (EPQ) model with random defective rate. In this note, we will offer a simple algebraic approach to replace his differential calculus skill to find the optimal solution under the expected annual cost minimization.


Sign in / Sign up

Export Citation Format

Share Document