Development of a method for increasing the stability of mine workings located and formed in the filling array

Author(s):  
V. V. Yakheev ◽  
V. A. Khakulov ◽  
V. A. Mishanov ◽  
V. A. Kretov
Keyword(s):  
2017 ◽  
Vol 25 ◽  
pp. 35-42
Author(s):  
Olexandr Solodyankin ◽  
Sergey Hapieiev ◽  
Mikhail Vygodin ◽  
Valentin Yanko

Objective of the studies is the substantiation of energy efficient technologies to support permanent mine workings under complicated conditions of mines in Western Donbass. The results of analysis of geomechanical processes within rock mass neighbouring extended mine working have been demonstrated. The possibility to fill up underpropped area at different stages of a mine working construction has been shown. Efficient technology to improve the stability of mine workings by means of underpropped area filling up with hardening mixtures pneumatically has been considered. The results of the new technology to fill up underpropped area while constructing the main crosscut in Samarskaia mine (“DTEK Pavlogradugol” Company) have been demonstrated.


1997 ◽  
Vol 34 (2) ◽  
pp. 59-63
Author(s):  
A. D. Borulev ◽  
N. I. Vorona ◽  
I. V. Dimitriev ◽  
L. V. Ostreiko

2011 ◽  
Vol 57 (2) ◽  
pp. 57-65
Author(s):  
Arnošt Grmela ◽  
Petr Žůrek ◽  
Radovan Kukutsch ◽  
Robert Kořínek

Abstract The Jeroným Mine, situated in the locality of the Slavkovský les Protected Landscape Area, is a unique heritage site associated with mining in the 15th and 16th centuries. To make this mine working accessible to the public, it is necessary in the first place to stabilize underground voids and to ensure such internal microclimatic conditions so that any degradation of the mine working and any hazard to workers performing restoration operations and later to visitors will not occur. The contribution deals with the factors conditioning and affecting the stability of this system of mine workings.


Sign in / Sign up

Export Citation Format

Share Document