scholarly journals Contingency Planning for the Microwave Anisotropy Probe Mission

Author(s):  
Michael Mesarch ◽  
David Rohrbaugh ◽  
Conrad Schiff
1992 ◽  
Author(s):  
K. KELLOGG ◽  
V. KAPOOR ◽  
J. VACCHIONE ◽  
D. RASCOE ◽  
T. KOMAREK ◽  
...  
Keyword(s):  
Ka Band ◽  

Author(s):  
Douglas Eng ◽  
John W. Hunt ◽  
Sanae Kubota ◽  
Dawn Moessner ◽  
Daniel A. Ossing ◽  
...  
Keyword(s):  

2019 ◽  
Vol 10 (03) ◽  
pp. 495-504
Author(s):  
Ethan Larsen ◽  
Daniel Hoffman ◽  
Carlos Rivera ◽  
Brian M. Kleiner ◽  
Christian Wernz ◽  
...  

Introduction Electronic health record (EHR) downtime is any period during which the EHR system is fully or partially unavailable. These periods are operationally disruptive and pose risks to patients. EHR downtime has not sufficiently been studied in the literature, and most hospitals are not adequately prepared. Objective The objective of this study was to assess the operational implications of downtime with a focus on the clinical laboratory, and to derive recommendations for improved downtime contingency planning. Methods A hybrid qualitative–quantitative study based on historic performance data and semistructured interviews was performed at two mid-Atlantic hospitals. In the quantitative analysis, paper records from downtime events were analyzed and compared with normal operations. To enrich this quantitative analysis, interviews were conducted with 17 hospital employees, who had experienced several downtime events, including a hospital-wide EHR shutdown. Results During downtime, laboratory testing results were delayed by an average of 62% compared with normal operation. However, the archival data were incomplete due to inconsistencies in the downtime paper records. The qualitative interview data confirmed that delays in laboratory result reporting are significant, and further uncovered that the delays are often due to improper procedural execution, and incomplete or incorrect documentation. Interviewees provided a variety of perspectives on the operational implications of downtime, and how to best address them. Based on these insights, recommendations for improved downtime contingency planning were derived, which provide a foundation to enhance Safety Assurance Factors for EHR Resilience guides. Conclusion This study documents the extent to which downtime events are disruptive to hospital operations. It further highlights the challenge of quantitatively assessing the implication of downtimes events, due to a lack of otherwise EHR-recorded data. Organizations that seek to improve and evaluate their downtime contingency plans need to find more effective methods to collect data during these times.


2012 ◽  
Vol 14 (02) ◽  
pp. 1250012 ◽  
Author(s):  
FABIENNE LORD ◽  
SETH TULER ◽  
THOMAS WEBLER ◽  
KIRSTIN DOW

Technological hazards research, including that on oil spills and their aftermath, is giving greater attention to human dimension impacts resulting from events and response. While oil spill contingency planners recognize the importance of human dimension impacts, little systematic attention is given to them in contingency plans. We introduce an approach to identifying human dimensions impacts using concepts from hazard and vulnerability assessment and apply it to the Bouchard-120 oil spill in Buzzards Bay, MA. Our assessment covers the spill, emergency response, clean-up, damage assessment, and mid-term recovery. This approach, while still exploratory, did demonstrate that the spill produced a range of positive and negative impacts on people and institutions and that these were mediated by vulnerabilities. We suggest ways in which the framework may help spill managers to learn from events and improve contingency planning by anticipating risks to social systems and identifying strategies to reduce impacts.


Sign in / Sign up

Export Citation Format

Share Document