2013 ◽  
Vol 415 ◽  
pp. 287-293
Author(s):  
Li Xin Zheng

The electric power engineering project has many characteristics like large scale, long construction period, complex technology, many units involved and so on. In order to avoid risk and improve the risk management efficiency of electric power engineering project, this article established a risk evaluation index system from the perspective of environmental risk, economic risk, technical risk, management risk, and market risk. According to the characteristics of the risk evaluation indicators, it built a multi-level fuzzy comprehensive evaluation model and took a power construction projects as an example to analyze the application of the model.


2013 ◽  
Vol 671-674 ◽  
pp. 3087-3090
Author(s):  
Lang Gao ◽  
Xin Li

According to the current situation and problems of the risk response of China's construction market, from the selection of risk factors and its weight, expert evaluation score, and other aspects, and applies the fuzzy comprehensive evaluation method of the system thinking, analyzes the reliability of the risk response plan, studies the application of the fuzzy comprehensive evaluation method in more risk solutions to select, and the results show that the comprehensive evaluation value of each plan is organic combined the experience of experts with the strict quantitative analysis, and enhance the evaluation results of scientific and reasonable and accuracy.


2013 ◽  
Vol 444-445 ◽  
pp. 1751-1755
Author(s):  
Qing Hua Zhan ◽  
Shi Mei Wang

This paper first introduces the meaning and mission of the economic evaluation of geological disasters,as well as the basic concepts of different economic evaluation, and then discuss the methods of economic evaluation of geological disasters, including multi-level fuzzy comprehensive evaluation method and statistical data evaluation method, and gives the outlook of the economic evaluation of geological disasters.


Sign in / Sign up

Export Citation Format

Share Document