scholarly journals Design and Experiment of Dry-Ice Cleaning Mechanical Arm for Insulators in Substation

2020 ◽  
Vol 10 (7) ◽  
pp. 2461 ◽  
Author(s):  
Shufeng Tang ◽  
Pengfei Zhou ◽  
Xu Wang ◽  
Yue Yu ◽  
Hualei Li

Polluted flashover of insulators has always been a crucial hidden peril to the reliability of substation for supplying electricity. At present, the insulator of the substation is mainly cleaned manually in the case of power-cut, which greatly affects the reliability of power supply and operation safety. In this paper, an insulator dry-ice mechanical arm capable of electrified working is proposed. Under the regular operation of the power grid, the operator can remotely control the mechanical arm to clean the insulators of the substation with high-pressure gas mixed with dry-ice particles. This will not only ensure the regular operation of the power grid, but also greatly protects the safety of personnel. Considering the operation environment and high-voltage working conditions of the substation, the mechanism and control system of the dry-ice cleaning mechanical arm are designed, and the motion analysis, simulation, and strength analysis of the mechanical arm are carried out. Finally, the high-voltage-insulation test of the mechanical arm and the actual operation of the substation insulator cleaning working test are carried out, which proves that this mechanical arm can adapt to the operation environment of the substation, and the working is stable, safe, and reliable, which has an important application value to solve the problem in the cleaning of the substation insulator and other electrified equipment.

2019 ◽  
Vol 115 ◽  
pp. 01001
Author(s):  
Zhen Hu ◽  
Ding Wang ◽  
Yangwu Shen ◽  
Daojun Chen ◽  
Yongyan Liu

The purpose of voltage stability prevention and control strategy is to minimize the impact of expected accidents on the whole power grid while ensuring safe power supply. In this paper, it is expected that the accident has a large impact on the system voltage and makes the voltage margin of each node low. in order to not only adjust the node voltage, but also reduce the disturbance impact, a voltage stability prevention and control strategy is proposed based on the characteristic analysis.


2011 ◽  
Vol 143-144 ◽  
pp. 14-18
Author(s):  
Dan Xu ◽  
Zhan Zhang

In view of the present our country coal mine high-voltage power grid widely used 6kV or 10kV cable direct power supply condition. To describe a DSP-based adaptive line selection leakage protection program of high-voltage power grid. It adopts under-compensation, adaptive random tuning and phase-sensitive comparison to judge the fault branch and achieve selective leakage protection, and make the protection system more perfect and reliable.


2016 ◽  
Vol 31 (12) ◽  
pp. 8182-8194 ◽  
Author(s):  
Qianming Xu ◽  
Fujun Ma ◽  
An Luo ◽  
Zhixing He ◽  
Huagen Xiao

2013 ◽  
Vol 273 ◽  
pp. 389-393
Author(s):  
Yu Mei Wang ◽  
Xu Yang ◽  
Hao Zhang

When the power supply system for coal mine underground take place a short circuit fault, multilevel switch often respond at the same time. And the existing comprehensive protector cannot satisfy the real-time and rapid quality requirements of preventing override trip system for high-voltage power grid of coal mine underground. So this paper put forward the research for comprehensive protector of preventing override trip based on the EtherCAT. This paper first analyzes the principle and characteristics of the EtherCAT technology; and then puts forward the overall scheme of preventing override trip system; Finally, study and design the slave station and master station of preventing override trip system based on the EtherCAT.