AbstractIn deep tunnels with hydro-geological conditions, it is paramount to investigate the geological structure of the region before excavating a tunnel; otherwise, unanticipated accidents may cause serious damage and delay the project. The purpose of this study is to investigate the geological properties ahead of a tunnel face using electrical resistivity tomography (ERT) and tunnel seismic prediction (TSP) methods. During construction of the Nosoud Tunnel located in western Iran, ERT and TSP 303 methods were employed to predict geological conditions ahead of the tunnel face. In this article, the results of applying these methods are discussed. In this case, we have compared the results of the ERT method with those of the TSP 303 method. This work utilizes seismic methods and electrical tomography as two geophysical techniques are able to detect rock properties ahead of a tunnel face. This study shows that although the results of these two methods are in good agreement with each other, the results of TSP 303 are more accurate and higher quality. Also, we believe that using another geophysical method, in addition to TSP 303, could be helpful in making decisions in support of excavation, especially in complicated geological conditions.


2015 ◽  
Author(s):  
Dengguo Zhou ◽  
Weizhong Wang ◽  
Jie Zhang ◽  
Daniel R.H. O'Connell
Keyword(s):  

2019 ◽  
Vol 59 (5) ◽  
pp. 435-447 ◽  
Author(s):  
Farhad Farhadi Ayoublou ◽  
Majid Taromi ◽  
Abbas Eftekhari

The construction of tunnel portals in mountainous or slope areas often involves problems, which are closely related to factors, such as slope topography, geology, geotechnics, construction geometry and the tunnel excavation method. The activation of landslides or the acceleration of these events is one of the main challenges faced in the construction of tunnel portals. In this paper, we address the instability problem in Sabzkuh tunnel portal that has been excavated with a complex geological profile and high seismicity in Iran’s High Zagros region. The complexity and intense heterogeneity in geological formations, land acquisition problems and the lack of appropriate monitoring programs led to the instability of the tunnel portal. The excavation process started without applying appropriate techniques for a ground stabilization. The use of inappropriate tunnel excavation methods for this unstable geological structure resulted in an activation of an old Solaghan fault and several collapses in the tunnel. Crossing the collapsed areas and reinforcing the tunnel portal took about 7 months and imposed heavy costs on the project. This case study deals with the importance of the choice of the site location, ground and underground monitoring, analysing and summarizing the collected data in order to prepare a geological model before and during the construction process.