Meta-Heuristic Approach for Software Project Risk Schedule Analysis
This chapter illustrates a technique to shorten the time duration using structured method. This is done by considering multiple resource constraints apart from time for the software project. The resource constraints are due to limited availability of resources (hardware, software, people, etc.). The difficulty is to locate minimal duration schedule. This is done by assigning the start time for each activity with the clear representation of precedence among them and resources available. There are various optimization approaches available but authors have selected a genetic algorithm. This method emulates the concept of biological evolution that is based on natural selection. This chapter concludes that additional research is needed in this area to provide better outcomes.