The Anatomy-Centric Approach Towards Managing Complex Projects

Author(s):  
Lars Taxén

The purpose of this chapter is to describe and discuss the anatomy-centric approach towards coordinating complex development projects. The content of the chapter is mainly based on my empirical experience from Ericsson.

2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Barbara Gaudenzi ◽  
Abroon Qazi

PurposeProject-driven supply chain risks pose a significant threat to the success of complex development projects, in terms of achieving key performances such as quality, time and efficiency. The purpose of this paper is to adopt a supply chain quality perspective in order to explore and better understand the unique attributes of risks associated with project-driven supply chains for continuously improving the quality of both processes and products.Design/methodology/approachTheoretically grounded in the framework of Bayesian Belief Networks and Game theory, this paper develops a structured process for assessing and managing risks in project-driven supply chains. The application of the proposed approach is demonstrated through a simulation case study conducted on the development project of Boeing 787 aircraft.FindingsThe conflicting incentives amongst stakeholders in a supply chain can jeopardise the success of a project and therefore, assessment of this category of risks classified as “Game theoretic risks” needs special consideration. Project-driven supply chain risks pose a significant threat to the success of complex projects. The results of the study clearly revealed that without mitigating the game theoretic risks, the main objective of timely completion of the Boeing 787 project was not materialised. Further, the lack of management expertise was the major factor contributing to the overall project costs including cost of quality.Originality/valueThe proposed process and analyses present a significant and original insight in terms of capturing the key determinants of both product and service quality such as product performance, convenience and reliability of service, timeliness, ease of maintenance, flexibility, and customer satisfaction and comfort. Propositions are developed for ascertaining the significance of information sharing in a project-driven supply chain, and a fair sharing partnership is introduced to help supply chain managers in managing game theoretic risks in order to achieve the goals of quality, time and efficiency.


2003 ◽  
pp. 26-39
Author(s):  
V. Maevsky ◽  
B. Kuzyk

A project for the long-term strategy of Russian break-through into post-industrial society is suggested which is directed at transformation of the hi-tech complex into the leading factor of economic development. The thesis is substantiated that there is an opportunity to realize such a strategy in case Russia shifts towards the mechanism of the monetary base growth generally accepted in developed countries: the Central Bank increases the quantity of "strong" money by means of purchasing state securities and allocates the increment of money in question according to budget priorities. At the same time for the realization of the said strategy it is necessary to partially restore savings lost during the hyperinflation period of 1992-1994 and default of 1998 and to secure development of the bank system as well as an increase of the volume of long-term credits on this base.


Sign in / Sign up

Export Citation Format

Share Document