Marked Graph of Four Work Station Automated Manufacturing System and Sign Incidence Matrix
2015 ◽
Vol 813-814
◽
pp. 1121-1125
Keyword(s):
In this paper we take the marked graph of Four Work Station Automated Manufacturing System and analyze it using sign incidence matrix. By the Analysis we found a number of places which are both siphon and trap.
2020 ◽
Vol 50
(10)
◽
pp. 3613-3627
◽
Keyword(s):
2012 ◽
Vol 12
(3)
◽
pp. 243
◽
1998 ◽
Vol 17
(1)
◽
pp. 1-22
◽
Keyword(s):
1998 ◽
Vol 36
(8)
◽
pp. 2167-2184
◽