The Optimization to Control System of Desulfurization in Furnace of 300MW CFB Boiler
2012 ◽
Vol 614-615
◽
pp. 1509-1513
Keyword(s):
This paper contraposes 300MW CFB boiler of Shanxi certain coal-fired power plant, then optimize the control system of desulfurization and remake limestone transmission system. Collect the signal to establish knowledge base for judging starting or stalling control of feeding machine through lots of experiments. Adopt feedback control strategy to adjust the speed of feeding machine. Achieve the purpose of automatically controling the starting or stalling of feeding machine and the speed of feeding machine finally.
2016 ◽
Vol 744
◽
pp. 012104
◽
2008 ◽
Vol 54
(6)
◽
pp. 647-663
◽
Keyword(s):
Keyword(s):
2016 ◽
Vol 81
◽
pp. 22-31
◽
Keyword(s):