An HCCI Engine: Power Plant for a Hybrid Vehicle

Author(s):  
Ruonan Sun ◽  
Rick Thomas ◽  
Charles L. Gray
2021 ◽  
Vol 234 ◽  
pp. 113947
Author(s):  
Alexandre Persuhn Morawski ◽  
Leonardo Rodrigues de Araújo ◽  
Manuel Salazar Schiaffino ◽  
Renan Cristofori de Oliveira ◽  
André Chun ◽  
...  

Author(s):  
Muhammad Idris ◽  
Raras H. Kartika ◽  
Adi Nugroho ◽  
Dwi Rian Sulaeman ◽  
Fardha S. I. Visang ◽  
...  

2019 ◽  
Author(s):  
Mafizul Huq ◽  
Md. Mustafizur Rahman ◽  
A. K. M. Sadrul Islam ◽  
Md. Nurul Absar Chowdhury

Aviation ◽  
2011 ◽  
Vol 15 (1) ◽  
pp. 25-29 ◽  
Author(s):  
Mykola Kulyk ◽  
Volodymir Kharchenko ◽  
Mykhailo Matiychyk

A new pattern of twin-engine power plant installation in an unmanned aerial vehicle of the conventional aerodynamic scheme is presented. Reasons for moments of harmful pitching and diving are identified and a method of elimination is suggested. Santrauka Pateikta nauja dviejų variklių patalpinimo schema bepiločiame orlaivyje, turinčiame normalią aerodinaminę schemą. Nustatytos pavojingų polinkio momentų priežastys bei pasiūlyti jų pašalinimo būdai.


1956 ◽  
Vol 28 (4) ◽  
pp. 781-782
Author(s):  
Koki Fukushima ◽  
Tadamoto Nimura ◽  
Ken'iti Kido

2011 ◽  
Vol 328-330 ◽  
pp. 2207-2210
Author(s):  
Xiao Jing Sun ◽  
Xing Gui Wang ◽  
Chun Ning Wang

The Internal Combustion Engine Power Plant and Flywheel Battery were the two primarily compositive units of the Internal Combustion Engine Power Plant --Rotary UPS, among them the Internal Combustion Engine Power Plant ensured the continuous power supply to the load after the breaking of the mains supply, the Flywheel Battery ensured the uninterruptible continuous power supply to the load when mains supply switched to the Internal Combustion Engine Power Plant, so the paper started with the two units, Introduced the control system structure and principle, and focused on discussing the method of achieving the Internal Combustion Engine Power Plant --Rotary UPS telecommunication by Ethernet. The method had been applied in correlative production. The practice showed that it was convenient for usage and high reliability.


Author(s):  
Dedi Emawan ◽  
Aditya Tirta Pratama ◽  
Henry Nasution

Power plants as electricity producers need to be maintained using monitoring performance and continuous improvements. Company management of power plant is difficult to make a decision for the continuous improvement, requires Performance Measurement Tools (PMT) to determine the performance of a gas engine power plant. PMT developed using Key Performance Indicator (KPI) that was defined through Forum Group Discussion (FGD) with different field of expertise in company and based on references and the weighting of KPI criterion that was developed by Analytic Hierarchy Process (AHP). This study has developed the weight of KPI that the weight of each criterion which will be used as a reference is Rank 1 – Power Output (MW) – PO (70.81%), Rank 2 – Heat Rate (Btu/kWh) – HR (14.91%), Operating Ratio (%) – OR (8.06%) and Rank 4 – Capacity Factor (%) – CF (6.22%).


Sign in / Sign up

Export Citation Format

Share Document