Developing a Master Production Schedule Using Fuzzy Mixed Integer Linear Programming
This paper considers the hierarchical production planning (HPP) concept to solve a production planning problem in the process industry in a fuzzy environment. The adopted fuzzy HPP consists of two levels in which a fuzzy aggregate production planning (FAPP) model is developed in the first level, and then a fuzzy disaggregate production planning (FDPP) model is developed at the second level. The FAPP was reported by Omar et al. [1] and therefore, this research paper discusses the FDPP model. We formulated the disaggregate model as a fuzzy mixed-integer linear programming model that aims to develop a master production schedule in which numbers of optimal batches are developed in presence of setup time. In addition, we evaluate the performance of the FMILP by comparing its results with a previously reported approach. The findings indicate that significant cost savings were achieved by adopting the fuzzy mathematical programming approach.