Research on Application of Project Management in Whole Process of Photovoltaic Engineering

2021 ◽  
2021 ◽  
Vol 236 ◽  
pp. 05002
Author(s):  
Longbo Zhang ◽  
Hao Liu

BIM technology can participate in the entire process of building construction projects, using a three-dimensional way to restore all links involved in the process of building production. This intuitive and clear presentation method helps architects correct and quickly repair existing loopholes in a timely manner, ensure the smooth development of construction projects, improve efficiency and reduce losses due to project delays.


2016 ◽  
Vol 24 (4) ◽  
pp. 67-79
Author(s):  
Sina Baghbaniyazdi ◽  
Amir Ekhlassi ◽  
Kamal Sakhdari

While previous research on application adoption has partly advanced our understanding of factors affecting the adoption of mobile applications, less attention has been given to the whole process of application development, from idea characteristics to the supportive activities after launch. In particular, less is known about these factors in the context of developing countries, where mobile applications are gaining increasing popularity. In this vein, this paper, adopting a grounded theory approach, aims to identify factors influencing the adoption of entertainment mobile application from the developer's points of view focusing on different phases of application development in the novel context of Iran. The authors' in-depth semi-structured interviews with experts in mobile application development firms indicate 15 factors classified within four categories based on the application development process, entailing idea characteristics, design, marketing communications and supportive activities. The implications of these findings provides valuable insight into why some mobile applications are more successful than others.


Author(s):  
Перцева ◽  
Elena Pertseva

The article is devoted to management of corporate sustainability program with project management tools. Corporate sustainability describes business strategy and ongoing activity built around social and environmental considerations. Though corporate sustainability programs are implemented through projects, there is little research on application of project management tools to realization of such programs. The present study has gone some way towards enhancing our understanding of interrelation between implementation of corporate sustainability strategy and project management tools used in an organization.


2014 ◽  
Vol 638-640 ◽  
pp. 2346-2350
Author(s):  
Yi Lin Yin ◽  
Peng Juan Li

Recently, risk allocation (RA) has become a research focus as a pre-variable for its damaging to the improvement of project management performance (PMP), but the related measured operations were absence. Based on the theory of incomplete contract, firstly, this paper mapped the initial contract,renegotiation and contract efficiency into the whole process of project RA, constructed a three-stage theoretical models including initial risk allocation (IRA) for contracting , project management performance (PMP) and risk reallocation for contract performance, and depicted their measuring dimensions. Secondly, this paper developed RA measure scale based upon questionnaire design and empirical analysis, and the reliability and validity were analyzed. The research guided significance for contractual arrangements for the project RA and exploring relevance to other variables.


Sign in / Sign up

Export Citation Format

Share Document