scholarly journals Research on Application Strategy of BIM Technology in Construction Project Management

2021 ◽  
Vol 236 ◽  
pp. 05002
Author(s):  
Longbo Zhang ◽  
Hao Liu

BIM technology can participate in the entire process of building construction projects, using a three-dimensional way to restore all links involved in the process of building production. This intuitive and clear presentation method helps architects correct and quickly repair existing loopholes in a timely manner, ensure the smooth development of construction projects, improve efficiency and reduce losses due to project delays.

2012 ◽  
Vol 209-211 ◽  
pp. 1363-1369 ◽  
Author(s):  
Wen Fa Hu ◽  
Da Wei Li ◽  
Rong Hu

The increasing complexity of construction projects as a common trend has had a significant impact on management maturity assessment and improvement for the project participating units, especially for the owners’ Project Management Office (PMO). While most maturity models are rationalistic, this paper presents a practical complex construction project management maturity model based on project management three-dimensional perspective. Integrating Organizational Project Management Maturity Model (OPM3) and Best Practices (BPs) derived from 2010 Shanghai Expo practice, this case-based maturity model is constituted by three sub-models: PBS Maturity, Process Maturity and Organization System Maturity. The model uses structured questionnaire consisting of BPs to implement assessment. The proportion of BPs achieved is considered as the maturity level of assessment objectives. Shanghai Expo AB Area is used to test the validity of the model. The result shows that owners’ PMO can assess and improve their project management maturity with the model effectively.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


Mathematics ◽  
2019 ◽  
Vol 7 (12) ◽  
pp. 1149 ◽  
Author(s):  
Tingting He ◽  
Guiwu Wei ◽  
Jianping Lu ◽  
Cun Wei ◽  
Rui Lin

Since the reform and opening up, Chinese economic and social development has undergone great changes, and the people’s living standards have improved markedly. For the national economy, the engineering construction is not only a carrier for specific economic tasks, but also a driving force for rapid and sustained economic development. With the continuous expansion of the scale of construction projects, safety management problems of construction projects are constantly exposed. How to effectively avoid accidents has become an important issue to be solved urgently in the construction industry. This paper mainly evaluates human factors in the process of construction project management, such as workers’ proficiency, workers’ safety awareness, technical workers’ quality, and workers’ emergency capacity, with the purpose of helping China’s construction projects proceed smoothly. In this research, we provide a multiple attribute group decision-making (MAGDM) technique based on Pythagorean 2-tuple linguistic numbers (P2TLNs) and the VIseKriterijumska Optimizacija I KOmpromisno Resenje (VIKOR) method for evaluating the human factors of construction projects. P2TLNs are used to represent the performance assessments of decision makers. Relying on a P2TLWA operator, P2TLWG operator, and the essential VIKOR method, a general framework is established. An application is presented to test the validity of the new method, and a comparative analysis with two algorithms and the P2TL-TODIM method is illustrated with detail.


2019 ◽  
Vol 50 (2) ◽  
pp. 226-242 ◽  
Author(s):  
José I. Ortiz ◽  
Eugenio Pellicer ◽  
Keith R. Molenaar

This research describes the managerial approaches that contractors follow to determine different types of contingencies in construction project management. Two large Spanish general contractors were selected for an in-depth analysis. Interviews and surveys were conducted with six additional companies to explore the external validity of the findings. Managers constrain time and cost buffers through project objectives, applying heuristics to determine inventory buffers. The management of capacity buffers is entrusted to subcontractors. The contractors take advantage of scope and quality buffers to meet project objectives but rarely share these buffers with the owner, unless the owner is an internal client.


2011 ◽  
Vol 243-249 ◽  
pp. 6362-6368
Author(s):  
Yan Zhang ◽  
Chang Jiang Liu

In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the production of general products, the risk increases the difficulty of construction project management, operating costs and the possibility of potential losses, therefore, risk management emerged and become an increasingly important integral part of project management. In this paper, fuzzy analytic hierarchy be used to construction project risk assessment, and to order the sort of each risk in order to prevent significant risks. On an actual project - the new stadium construction in Weifang City risk management case study, the reduction of risk of project failure is expected, but also the project is hoped for other industries to provide some reference for risk management.


2017 ◽  
Vol 21 ◽  
pp. 587-595 ◽  
Author(s):  
Ion Șerbanoiu ◽  
Marina Verdeș ◽  
Adrian Alexandru Şerbănoiu ◽  
Bogdan Vasile Șerbanoiu ◽  
Mihaela Munteanu

The current trends in the construction industry, considering the magnitude and complexity of construction projects required the development of an appropriate methodology in the design, commissioning work and completion of works. The objective imposed creation of the "Office of Project Management" and all processes, tools and techniques of project management respects besides applicable standards and legislation construction, also imposed code of ethics and professional conduct of the PMI that guides practitioners professional project management, construction engineers, installers, architects etc. and describes the expectations that they have of themselves and of others.


2011 ◽  
Vol 217-218 ◽  
pp. 262-267
Author(s):  
Xiao Yan Wang ◽  
Shao Yan Fan

Management and auditing of construction project, which is a certain trend of management development of modern construction project, is a new theory in audit practicing of construction project and an effective way to work out at the highest degree the returns on construction project investment, improve construction project management performance levels, avoid at the highest degree redundancy of construction projects and eliminate waste of resources. This essay points out the importance of the use of management auditing in construction projects based on the analysis of disadvantages in conventional construction projects management. And it builds up frame for management auditing of construction projects, puts forward performance evaluation methods of management control auditing.


2018 ◽  
Vol 2 (1) ◽  
pp. 6
Author(s):  
Salhi Roumeissa ◽  
Messaoudi Karima ◽  
Sassi Boudemagh Souad

Time is an indicator of project performance, and along with cost and quality factors, it is the project roadmap, as it determines its success. In Algeria, among the problems often encountered in the construction of projects are timeouts. A questionnaire survey was conducted with experts in the field of construction, in order to know the factors causing delays in projects. The results show that the managerial factors (relating to planning, organization and management) are the most important in Algeria. Therefore, the use of Project Management is essential, given the need to promote this area in terms of processes and tools used, to allow the various project stakeholders to optimize the planning of activities and resources, to complete the project. project in a timely manner and reach the stage of project success. Recommendations were proposed and managerial solutions were suggested using the guide of PMBOK version 5.


2021 ◽  
Vol 19 (17) ◽  
Author(s):  
Yew-Hou Tung ◽  
Fah-Choy Chia ◽  
Felicia Yan-Yan Yong

Digital technologies have recently started to enter the construction industry, gradually changing how infrastructure, real estate and other built assets are designed, constructed, operated and maintained. Being among the least digitalized sectors, it is predicted that digital technologies will substantially increase the productivity, decrease the costs, and improve site safety of construction projects. Thus, the primary objective of this pilot study is to explore the usage of digital technologies for the 12 components of construction project management. A total of 32 respondents participated in the online survey. The results indicate that the usage of digital technologies was significantly higher in the management of scheduling, documenting, designing, and assigning costs. The aspects for digitalized safety, stakeholders, equipment, and materials are room for further improvement.


2019 ◽  
Vol 2019 ◽  
pp. 1-14 ◽  
Author(s):  
Namhyuk Ham ◽  
Sanghyo Lee

The main purpose of this study is to investigate the advantages of digital fabrication pertaining to construction project management, in particular, in terms of different project management factors, using case studies of irregular-shaped buildings in which digital fabrication has versatile applications. This study collected secondary data corresponding to 27 construction projects of irregular-shaped buildings that implemented digital fabrication. Success criteria were developed based on the Project Management Body of Knowledge (PMBOK) to assess the benefits of implementing digital fabrication for management of the considered construction projects of irregular-shaped buildings. Content analysis was performed to investigate the degree of satisfaction for the success criteria of each project. With this approach, it is possible to see which success criterion appears more times as a positive factor and which ones appear as challenges or problems. Among the positive benefits of digital fabrication on construction project management, quality increase and control appeared in the highest number of projects (17 out of 27 projects) at the highest frequency (26 instances). However, among the negative benefits that were mentioned as challenging or causing difficulties of digital fabrication on construction project management, cost reduction and control appeared in the highest number of projects (14 out of 27 projects) at the highest frequency (21 instances). But it does not mean that the use of digital fabrication was overall negative.