Discussion on Secondary Operation Planning and Implementation in Box Culvert Jacking Construction of Existing Line

2021 ◽  
Author(s):  
Takanao SAIKI ◽  
Yuto TAKEI ◽  
Tadateru TAKAHASHI ◽  
Shota KIKUCHI ◽  
Hirotaka SAWADA ◽  
...  

Author(s):  
Zenagebriel Gebremedhn ◽  
Guofu Qiao ◽  
Lu Sun ◽  
Hang Li ◽  
Shi Bai ◽  
...  

2014 ◽  
Vol 598 ◽  
pp. 591-594 ◽  
Author(s):  
Li Yan Zhang

ISO 14649, known as STEP-NC, is new model of data transfer between CAD/CAM systems and CNC machines. In this paper, the modeling based on machining feature is proposed. The machining feature comes from the manufacturing process considering the restriction of machining technology and machining resource. Then the framework for computer aided process planning is presented, where the algorithms of operation planning is studied. The practical example has been provided and results indicate that machining feature based model can integrate with CAPP and STEP-NC seamlessly.


2012 ◽  
Vol 49 (11) ◽  
pp. 1267-1284 ◽  
Author(s):  
Olajide Samuel Oshati ◽  
Arun J. Valsangkar ◽  
Allison B. Schriver

Earth pressure data from the field instrumentation of a cast-in-place reinforced rectangular box culvert are presented in this paper. The instrumented culvert is a 2.60 m by 3.60 m double-cell reinforced cast-in-place rectangular box buried under 25.10 m of fill constructed using the induced trench installation (ITI) method. The average earth pressure measured across the roof was 0.42 times the overburden pressure, and an average of 0.52 times the overburden pressure was measured at mid-height of the culvert on the sidewalls. Base contact pressure under the rectangular box culvert was also measured, providing field-based data demonstrating increased base pressure resulting from downward drag forces developed along the sidewalls of the box culvert. An average increase of 25% from the measured vertical earth pressures on the roof plus the culvert dead load (DL) pressure was calculated at the culvert base. A model culvert was also tested in a geotechnical centrifuge to obtain data on earth pressures at the top, sides, and base of the culvert. The data from the centrifuge testing were compared with the prototype structure, and the centrifuge test results agreed closely with the measured field prototype pressures, in spite of the fact that full similitude was not attempted in centrifuge testing.