This paper proposes a new optimization technique that uses Particle Swarm Optimization (PSO) in residential grid-connected photovoltaic systems. The optimization technique targets the sizing of the battery storage system. With the liberation of power systems, the residential grid-connected photovoltaic system can supply power to the grid during peak hours or charge the battery during non-peak hours for later domestic use or for selling back to the grid during peak hours. However, this can only be achieved when the battery energy system in the residential photovoltaic system is optimized. The developed PSO algorithm aims at optimizing the battery capacity that will lower the operation cost of the system. The computational efficiency of the developed algorithm is demonstrated using real PV data from Strathmore University. A comparative study of a PV system with and without battery energy storage is carried out and the simulation results demonstrate that PV system with battery is more efficient when optimized with PSO.

2020 ◽  
Vol 2020 ◽  
pp. 1-17 ◽  
Author(s):  
Mega Ardisa Hapsari ◽  
Subiyanto Subiyanto

Several algorithms have been developed for building-attached photovoltaic system (BAPV) planning in educational institute based on PV capacity. Fewer studies on optimization algorithms for BAPV system planing on campus have been reported which considers a technoeconomic assessment. Therefore, a well-known robust algorithm is used as an optimization technique of BAPV system and considers technoeconomic assessment on campus. This paper presents a combination of analytical hierarchy process (AHP) with fuzzy theory (fuzzy AHP) for selecting a suitable and optimal design of BAPV system on academic campus. The BAPV system design is based on roof area and load profile at the project site. Five BAPV systems have been designed using five different types of PV. The design was comprehensively assessed by experts through a questionnaire with pairwise comparison model. Fuzzy AHP used to consider the qualitative and quantitative assessments that can affect the selection process. The comprehensive assessment in criteria consists of sizing systems, technical, economic, and environmental perspectives as criteria. The perspective is divided into 13 subcriteria. The results show degree of importance from the criteria-based fuzzy AHP as follows: technical > economic > environment > sizing system. Based on the assessment of criteria and subcriteria, design with monocrystalline is most suitable and polycrystalline as the least suitable design for BAPV system connected to grid and battery energy storage system in case study.


2021 ◽  
Vol 13 (21) ◽  
pp. 12264
Author(s):  
Young Hun Lee ◽  
In Wha Jeong ◽  
Tae Hyun Sung

The purpose of this study is to conduct an economic evaluation of a photovoltaic-energy storage system (PV–ESS system) based on the power generation performance data of photovoltaic operations in Korea, and to calculate the optimal capacity of the energy storage system. In this study, PV systems in Jeju-do and Gyeongsangnam-do were targeted, PV systems in this area were assumed to be installed on a general site, and the research was conducted by applying weights based on the facility’s capacity. All the analyses were conducted using the actual amount of Korea power exchange (KPX) transactions of PV systems in 2019. In order to calculate the optimal capacity of the power conditioning system (PCS) and the battery energy storage system (BESS) according to global horizontal irradiation (GHI), PV systems with a minimum/maximum/central value were selected by comparing the solar radiation before the horizontal plane for three years (2017–2019) in the location where the PV systems was installed. As a result of the analysis, in Jeju-do, if the renewable energy certificate (REC) weight decreased to 3.4 when there was no change in the cost of installing a BESS and a PCS, it was more economical to link to the BESS than the operation of the PV system alone. In Gyeongsangnam-do, it was revealed that if the REC weight was reduced to 3.4, it was more likely to link to the BESS than the operation of the PV system alone.


Energies ◽  
2021 ◽  
Vol 14 (3) ◽  
pp. 751
Author(s):  
Mariam A. Sameh ◽  
Mostafa I. Marei ◽  
M. A. Badr ◽  
Mahmoud A. Attia

During the day, photovoltaic (PV) systems are exposed to different sunlight conditions in addition to partial shading (PS). Accordingly, maximum power point tracking (MPPT) techniques have become essential for PV systems to secure harvesting the maximum possible power from the PV modules. In this paper, optimized control is performed through the application of relatively newly developed optimization algorithms to PV systems under Partial Shading (PS) conditions. The initial value of the duty cycle of the boost converter is optimized for maximizing the amount of power extracted from the PV arrays. The emperor penguin optimizer (EPO) is proposed not only to optimize the initial setting of duty cycle but to tune the gains of controllers used for the boost converter and the grid-connected inverter of the PV system. In addition, the performance of the proposed system based on the EPO algorithm is compared with another newly developed optimization technique based on the cuttlefish algorithm (CFA). Moreover, particle swarm optimization (PSO) algorithm is used as a reference algorithm to compare results with both EPO and CFA. PSO is chosen since it is an old, well-tested, and effective algorithm. For the evaluation of performance of the proposed PV system using the proposed algorithms under different PS conditions, results are recorded and introduced.


Energies ◽  
2021 ◽  
Vol 14 (12) ◽  
pp. 3683
Author(s):  
Yerasimos Yerasimou ◽  
Marios Kynigos ◽  
Venizelos Efthymiou ◽  
George E. Georghiou

Distributed generation (DG) systems are growing in number, diversifying in driving technologies and providing substantial energy quantities in covering the energy needs of the interconnected system in an optimal way. This evolution of technologies is a response to the needs of the energy transition to a low carbon economy. A nanogrid is dependent on local resources through appropriate DG, confined within the boundaries of an energy domain not exceeding 100 kW of power. It can be a single building that is equipped with a local electricity generation to fulfil the building’s load consumption requirements, it is electrically interconnected with the external power system and it can optionally be equipped with a storage system. It is, however, mandatory that a nanogrid is equipped with a controller for optimisation of the production/consumption curves. This study presents design consideretions for nanogrids and the design of a nanogrid system consisting of a 40 kWp photovoltaic (PV) system and a 50 kWh battery energy storage system (BESS) managed via a central converter able to perform demand-side management (DSM). The implementation of the nanogrid aims at reducing the CO2 footprint of the confined domain and increase its self-sufficiency.