A Study on Generation Adequacy Assessment Considering Probabilistic Relation Between System Load and Wind-Power

2013 ◽  
Vol 860-863 ◽  
pp. 2083-2087
Author(s):  
Xian Jun Qi ◽  
Jia Yi Shi ◽  
Xiang Tian Peng

Probability box (P-box) and interval probability (IP) were used to express both variability and imprecision of wind speed and output power of WTGs. The p-box of WTG's output power was constructed by empirical cumulative distribution function and K.S. confidence limits. The discrete IP distribution of WTG's output power was elicited from the p-box. The optimization model of imprecise generating capacity adequacy assessment incorporating wind power was established and solved by genetic algorithm (GA). Case study on RBTSW system shows the rationality of presented method.


2020 ◽  
Vol 18 (03) ◽  
pp. 554-563
Author(s):  
Nina Bordini Braga ◽  
Leandro da Silva Passos ◽  
Rosane Bessa da Silveira Santos ◽  
Jaqueline Gomes Pereira ◽  
Marcio Zamboti Fortes ◽  
...  

2015 ◽  
Vol 734 ◽  
pp. 744-747
Author(s):  
Zhen Bin Li ◽  
Xiao Lei Zhai

This paper takes Unit Commitment with Wind Power Electric Systems for instance and studies the application of relevant indicators in the short run adequacy decisions. It first conducted running adequacy assessment of the RBTS system, and then given unit combination solutions in the ample index constraints. The results show that the relevant indicators can be more accurately to depict the influence of random factors on system operation adequacy, and Unit Commitment decisions based adequacy index is able to give a unit commitment program at different adequacy levels. The research results provide a set of assessment indicators and assessment methods for short running adequacy problems of random fluctuations power accessing to large-scale power systems..


2012 ◽  
Vol 214 ◽  
pp. 417-422
Author(s):  
Dong Feng Yang ◽  
Su Quan Zhou

In the condition of large scale wind power connection, the uncertain of the wind power output takes great challenge to the peak regulation. In this paper for some wind power connection system, the influence of wind power connection to the peak regulation was studied by analyzing the system load and the historical real data after the wind power connection. The computation model which evaluates the normal units’ anti- peak adjusting capability was built and the multiply integer program algorithm was used to solve this model. A real case was used to test the exactness and feasibility of the computation model.


Sign in / Sign up

Export Citation Format

Share Document