HORIZONTAL DIRECTIONAL DRILLING (HDD) AND INTERSECT DRILLING METHOD ON A PRACTICAL EXAMPLE

Author(s):  
Rafal Wisniowski
2019 ◽  
Vol 11 (8) ◽  
pp. 2438
Author(s):  
Kwast-Kotlarek ◽  
Hełdak

The study presents the application of multi-criteria analysis, i.e., the Analytic HierarchyProcess (AHP), for the evaluation of investments related to the realisation of a high-pressure gaspipeline. The authors evaluated the realisation of the gas pipeline with the use of alternativemethods: the trenchless Horizontal Directional Drilling (HDD) method and the open excavationmethod, based on the example of the construction of a high-pressure gas pipeline DN1000. Sectionslocated in naturally valuable areas on the route of the pipeline Wierzchowice-Kiełczów (Poland)were analysed, on the section from the valve station in Czeszów to the Kiełczów node. The researchconsidered the following criteria: technical costs, economic costs, social costs, and environmentalcosts. The sum of these partial estimations is the “total cost” of the investment. Research revealedthat the technical costs of the open excavation method are in all cases higher than the technologicalcosts of the trenchless method during the realisation of a gas pipeline (in the AHP analysis, theyreceive an average score of −4 or −3, compared to a score of −2 for the HDD method). On the otherhand, the economic costs are comparable, with a slight advantage for the HDD method. The overallscore for the open excavation method obtained with use of the AHP multi-criteria evaluation is, fordifferent variants, approximately −19, while the evaluation of the realisation of a gas pipeline withuse of the Horizontal Directional Drilling method gives a score from −15 to −10, depending on thesection.


2016 ◽  
pp. 71-77
Author(s):  
V. S. Toropov ◽  
T. G. Ponomareva ◽  
S. Yu. Toropov ◽  
E. S. Toropov

The authors presented the approaches for a quantitative estimation of the additional resistance value of moving the pipeline in case of emergency on the collapsed wall of the borehole in absence of mud during the pipeline construction using the horizontal directional drilling method. In addition, the distribution and ratios of pressures, arising from the side of soil mass and drilling mud on the wellbore are found and shown to identify the potentially dangerous areas of the well arch collapse.


Sign in / Sign up

Export Citation Format

Share Document