Standard handbook for civil engineers

2004 ◽  
Vol 41 (09) ◽  
pp. 41-5329-41-5329
2020 ◽  
Vol 90 (4) ◽  
pp. 54-63
Author(s):  
Robert L. Reid ◽  
Laurie A. Shuster
Keyword(s):  

2020 ◽  
Vol 5 (2) ◽  
pp. 219-228
Author(s):  
Edy Sudaryanto

This study aims to identify and analyze opportunities, challenges, constraints and efforts of vocational high school or Sekolah Menengah Kejuruan (SMK) to create graduates especially accounting programs that are able to manage village funds. The object of the study are accounting program students of SMK PGRI 2 Cibinong. Data used in this study are primary data and secondary data. Data is collected using interviews, observation, and documentation. Data analysis methods use data reduction, data display and conclusion drawing/verification. The results of this study show that the SMK PGRI 2 Cibinong Bogor aware of the opportunities for SMK graduates of the accounting program to fill the scarcity of skilled human resources to manage village funds. But teachers have less experience in the practice of village fund accounting so that they do not have confidence in  teaching. Other constraints are less discussion of government accounting in the accounting syllabus and the absence of a standard handbook/module for teachers to teach accounting subjects.


1984 ◽  
Vol 16 (1-2) ◽  
pp. 51-77 ◽  
Author(s):  
M Knoester ◽  
J Visser ◽  
B A Bannink ◽  
C J Colijn ◽  
W P A Broeders

In the planning of the Delta-works, carried out in the Southwestern Netherlands, the Eastern Scheldt was the largest and therefore last tidal basin to be fully closed mainly to protect the area from floods. Increased recognition for the natural value of estuaries and a strong lobby from nature conservationists and shellfish producers led to a reconsideration of original plans, confirmed by a series of governmental decisions. Per consequence execution of the present plans will result in a storm-surge barrier at the entrance of the tidal basin together with two partitioning dams, separating the (reduced) tidal Eastern Scheldt from a new freshwater lake. Attention is paid to the present values in the Eastern Scheldt and briefly to changes involved by the project. The decisionmaking process is described and discussed: In the course of the project the majority of decisions taken were prepared by teams of ecologists, civil engineers, hydrologists and financial experts using policy-analysis methods. For guidance of developments in the influenced area the local government accepted a policy plan, in which human uses are regulated. Operations of the barrier are designed such that safety from flooding is guaranteed, while adverse effects for the tidal ecosystems are minimized.


Sign in / Sign up

Export Citation Format

Share Document