scholarly journals Project scheduling method with time using MRP system: A case study: Construction project in Libya

2015 ◽  
Vol 12 (1) ◽  
pp. 58-66 ◽  
Author(s):  
Ali Imetieg ◽  
Miroslav Lutovac
2019 ◽  
Vol 10 (11) ◽  
pp. 1131-1135
Author(s):  
Tomas Hambili Paulo Sanjuluca ◽  
◽  
Ricardo Correia ◽  
Anabela Antunes de Almeida ◽  
Ana Gloria Diaz Martinez ◽  
...  

Introduction: In order to have a good assessment of the quality of maternal and child health care, it is essential that there is up-to-date and reliable information. Objective: To evaluate the impact of the implementation of a computerized database of clinical processes in the admission, archive and medical statistics section, of Maternity hospital Irene Neto/Lubango-Angola. Methodology: A descriptive study with a quantitative and qualitative approach to carry out a retrospective case study deliveries and newborns, records from 2014 to 2017. Final considerations: The implementation of this project may contribute to the improvement of clinical management support management of the hospital as well as facilitating access to information for research and scientific production.


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


Sign in / Sign up

Export Citation Format

Share Document