optimal replacement policy
Recently Published Documents


TOTAL DOCUMENTS

124
(FIVE YEARS 11)

H-INDEX

21
(FIVE YEARS 2)

Author(s):  
K. Uma Maheswari ◽  
K. Subrahmanyam ◽  
A. Mallikarjuna Reddy

Large amounts of money are lost each year in the real-estate industry because of poor schedule and cost control, In Industry the investigated failure and repair pattern, reliabilities of generators, compressors, turbines, using simple statistical tools and simulation techniques. The repair duration is divided into the 1) Major repair 2) Minor repair, In major repair having (repair hour greater than a threshold valve) and Minor repair having (repair hour less than (or)equal to threshold valve). This approach is mainly for Weibull distribution method. In Weibull analysis is a common method for failure analysis and reliability engineering used in a wide range of applications. In this paper, the applicability of Weibull analysis for evaluating and comparing the reliability of the schedule performance of multiple projects is presented, while the successive performance of multiple projects is presented, while the successive repair times are increasing and are exposing to Weibull distribution, under these assumptions, an optimal replacement policy ‘T’ in which we replace the system, when the repair time reaches T. It can be determined that an optimal repair replacement policy T* such that long run average cost and the corresponding optimal replacement policy T* can be determined analytically.


2021 ◽  
Vol 12 (11) ◽  
pp. 1880-1885
Author(s):  
Dr. K. Uma Maheswari, Et. al.

Large amounts of money are lost each year in the real-estate industry because of poor schedule and cost control, In Industry the investigated failure and repair pattern, reliabilities of generators, compressors, turbines, using simple statistical tools and simulation techniques. The repair duration is divided into the 1)Major repair 2)Minor repair ,In major repair having(repair hour greater than a threshold valve)and Minor repair having(repair hour less than (or)equal to threshold valve).This approach is mainly for Weibull distribution method. In Weibull analysis is a common method for failure analysis and reliability engineering used in a wide range of applications. In this  paper, the applicability of Weibull analysis for evaluating and comparing the reliability of the schedule performance of multiple projects is presented, while the successive performance of multiple projects is presented ,while the successive repair times are increasing and are exposing  to Weibull distribution ,under these assumptions ,an optimal replacement policy ‘T’ in which we replace the system ,when the repair time reaches T. It can be determined that an optimal repair replacement policy T* such that long run average cost and the corresponding optimal replacement policy T* can be determined analytically.


Author(s):  
Majid Bohlooli-Zefreh ◽  
Majid Asadi ◽  
Afshin Parvardeh

This article is a study on the reliability characteristics of a system under a failure model called the generalized mixed [Formula: see text]-shock model. We assume that the system is subject to shocks according to a stochastic process. Each shock may cause some damage to the system. The system fails either the magnitude of the damage caused by a shock exceeds a threshold [Formula: see text] or the time between two consecutive shocks is less than a pre-specified threshold [Formula: see text] and simultaneously magnitude of the damage is bigger than a pre-specified critical threshold [Formula: see text] ([Formula: see text]). The survival function and other characteristics of the system lifetime are investigated. By imposing a cost function, we arrive at an optimal replacement policy for the system based on the proposed failure model. Several examples are provided under which we illustrate the theoretical results numerically and graphically.


Author(s):  
Shey-Huei Sheu ◽  
Tzu-Hsin Liu ◽  
Wei-Teng Sheu ◽  
Zhe-George Zhang ◽  
Jau-Chuan Ke

2021 ◽  
Vol 6 (10) ◽  
pp. 10602-10619
Author(s):  
YanLing Li ◽  
◽  
GenQi Xu ◽  
Hao Chen ◽  
◽  
...  

<abstract><p>This article studies a parallel repairable degradation system with two similar components and a repairman who can take a single vacation. Suppose that the system consists of two components that cannot be repaired "as good as new" after failures; when the repairman has a single vacation, the fault component of system may not be repaired immediately, namely, if a component fails and the repairman is on vacation, the repair of the component will be delayed, if a component fails and the repairman is on duty, the fault component can be repaired immediately. Under these assumptions, a replacement policy $ N $ based on the failed times of component 1 is studied. The explicit expression of the system average cost rate $ C(N) $ and the optimal replacement policy $ N^{\ast} $ by minimizing the $ C(N) $ are obtained, which means the two components of the system will be replaced at the same time if the failures of component 1 reach $ N^{\ast} $. To show the advantage of a parallel system, a replacement policy $ N $ of the cold standby system consisting of the two similar components is also considered. The numerical results of both systems are given by the numerical analysis. The optimal replacement policy $ N^* $ for both systems are obtained. Finally, the comparison of numerical results shows the advantages of the parallel system.</p></abstract>


10.26524/cm66 ◽  
2020 ◽  
Vol 4 (1) ◽  
Author(s):  
Govindaraju P ◽  
Ashok Kumar P

In this paper, we study a degenerative reparable system with two types of failure states.Any system after repair can not be as good as new. A general monotone process model for adegenerative system under partial product process is used. We use a replacement policy N based on the failure number of the system and to determine an optimal replacement policy N* such that the average cost rate is minimized.


10.26524/cm65 ◽  
2020 ◽  
Vol 4 (1) ◽  
Author(s):  
Govindaraju P ◽  
Rajendiran R

In this paper, we consider an optimal maintenance policy for a reparable deteriorating system subject to random shocks. For a reparable deteriorating system, the repair time by a partial product process and the failure mechanism by a generalized δshock process. Develop an explicit expression of the ling run average cost per unit time under N policy is studied.


Sign in / Sign up

Export Citation Format

Share Document