Future energy and environment management using fuzzy linear programming including energy recovered from urban solid wastes (Case study: Iran country)

2017 ◽  
Vol 36 (3) ◽  
pp. 953-966 ◽  
Author(s):  
Javad Nematian ◽  
Yosef Farzi
2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


2019 ◽  
Vol 6 (04) ◽  
Author(s):  
ASHUTOSH UPADHYAYA

A study was undertaken in Bhagwanpur distributary of Vaishali Branch Canal in Gandak Canal Command Area, Bihar to optimally allocate land area under different crops (rice and maize in kharif, wheat, lentil, potato in rabi and green gram in summer) in such a manner that maximizes net return, maximizes crop production and minimizes labour requirement employing simplex linear programming method and Multi-Objective Fuzzy Linear Programming (MOFLP) method. Maximum net return, maximum agricultural production, and minimum labour required under defined constraints (including 10% affinity level of farmers to rice and wheat crops) as obtained employing Simplex method were ` 3.7 × 108, 5.06 × 107 Kg and 66,092 man-days, respectively, whereas Multi-Objective Fuzzy Linear Programming (MOFLP) method yielded compromised solution with net return, crop production and labour required as ` 2.4 × 108, 3.3 × 107Kg and 1,79,313 man-days, respectively. As the affinity level of farmers to rice and wheat crops increased from 10% to 40%, maximum net return and maximum production as obtained from simplex linear programming method and MOFLP followed a decreasing trend and minimum labour required followed an increasing trend. MOFLP may be considered as one of the best capable ways of providing a compromised solution, which can fulfill all the objectives at a time.


Sign in / Sign up

Export Citation Format

Share Document