solid wastes
Recently Published Documents


TOTAL DOCUMENTS

2198
(FIVE YEARS 488)

H-INDEX

64
(FIVE YEARS 12)

2022 ◽  
Vol 204 ◽  
pp. 111988
Author(s):  
Jacqueline Zanin Lima ◽  
Eduardo Ferreira da Silva ◽  
Carla Patinha ◽  
Nuno Durães ◽  
Eny Maria Vieira ◽  
...  

Author(s):  
Hao Deng ◽  
Chen Tian ◽  
Li Li ◽  
Yanjie Liang ◽  
Shengjun Yan ◽  
...  

2022 ◽  
Author(s):  
Gabriele Centi ◽  
Alessia Borgogna ◽  
Gaetano Iaquaniello ◽  
Siglinda Perathoner ◽  
Annarita Salladini

2022 ◽  
pp. 128205
Author(s):  
Zahraa M. Lashen ◽  
Mohamed S. Shams ◽  
Hamdy S. El-Sheshtawy ◽  
Michal Slaný ◽  
Vasileios Antoniadis ◽  
...  

2022 ◽  
pp. 165-195
Author(s):  
Nitish Venkateswarlu Mogili ◽  
Nithya Murugesan ◽  
Seenivasan Ayothiraman ◽  
Rahul Gautam ◽  
Narendra Naik Deshavath ◽  
...  

2022 ◽  
Vol 2163 (1) ◽  
pp. 012007
Author(s):  
L Sánchez Ascanio ◽  
K A Torres Correa ◽  
D A Quintero-Coronel

Abstract Municipal Solid Wastes generated by human activities increase as the population grows; in Ocaña city, Norte de Santander, Colombia, these wastes reach a monthly production of about 2660 tons, made up of 65.6% waste food, 15.3% plastics, 9.9% toilet paper, 3.6% paperboard, 2.6% textile residues, 1.6% paper, 0.8% wood wastes, and 0.1% rubber. This work estimates the energy potential from municipal solid wastes for electricity generation and their production costs. A multicriteria decision analysis allowed selecting the best technology for the wastes processing based on their energy content. For the evaluated criteria, the incineration process showed priority. A model developed in the engineering equation solver software allowed calculating the electrical energy potential by integrating the incineration process with a Rankine cycle. By implementing a thermo-economic assessment, the electricity generation costs were determined, where the inversion, installation, operation, and maintenance costs were considered. 1974 KW of electrical power with generation costs of $300/KWh and a payback period of 2.5 years show the feasibility of this process.


Sign in / Sign up

Export Citation Format

Share Document