Coordinated primary control reserve by flexible demand and wind power through ancillary service–centered virtual power plant

Author(s):  
Ehsan Abbasi
Author(s):  
B. Roossien ◽  
A. van den Noort ◽  
R. Kamphuis ◽  
F. Bliek ◽  
M. Eijgelaar ◽  
...  

2015 ◽  
Vol 785 ◽  
pp. 627-631 ◽  
Author(s):  
Hei Wei ◽  
Rasyidah Mohamed Idris

Datong area has abundant wind energy. Due to problem in large scale of wind power grid connection, this paper introduces virtual power plant concept. As for beginning, power source characteristics of the wind farm, pumped storage power station and the thermal power plant are taken for analysis. Three types of different power plants are chosen to represent the virtual power plant modeling as well as adopting the NSGA2 optimization. As a conclusion, this case study proved that virtual power plant can increase the benefits of each power plant and the wind power plant output power curve become smoother.


2018 ◽  
Vol 2018 ◽  
pp. 1-11 ◽  
Author(s):  
Zhongfu Tan ◽  
Qingkun Tan ◽  
Yuwei Wang

For the virtual power plants containing energy storage power stations and photovoltaic and wind power, the output of PV and wind power is uncertain and virtual power plants must consider this uncertainty when they participate in the auction in the electricity market. In this context, this paper studies the bidding strategy of the virtual power plant with photovoltaic and wind power. Assuming that the upper and lower limits of the combined output of photovoltaic and wind power are stochastically variable, the fluctuation range of the day-ahead energy market and capacity price is stochastically variable. If the capacity of the storage station is large enough to stabilize the fluctuation of the output of the wind and photovoltaic power, virtual power plants can participate in the electricity market bidding. This paper constructs a robust optimization model of virtual power plant bidding strategy in the electricity market, which considers the cost of charge and discharge of energy storage power station and transmission congestion. The model proposed in this paper is solved by CPLEX; the example results show that the model is reasonable and the method is valid.