Influence of the organic volumetric loading rate on soluble chemical oxygen demand removal in a down-flow fixed-bed reactor treating abattoir wastewater

1995 ◽  
Vol 64 (4) ◽  
pp. 361-366 ◽  
Author(s):  
Rafael Borja ◽  
Charles J. Banks ◽  
Antonio Martín
2004 ◽  
Vol 49 (5-6) ◽  
pp. 281-288 ◽  
Author(s):  
S.J. Kim ◽  
P.Y. Yang

A two-stage entrapped mixed microbial cell (2SEMMC) process which separates nitrification and denitrification phases by the installation of the anoxic and oxic EMMC reactors packed with EMMC carriers was operated with 6, 4, 3, and 2 hours of hydraulic retention time (HRT) using simulated domestic wastewater. The activated sludge was immobilized using cellulose acetate for the EMMC carriers. Similar soluble chemical oxygen demand (SCOD) removal efficiencies of 90-97% were observed for all HRTs (SCOD loading rate of 0.84-2.30 g/L/d) applied. In order to achieve more than 80 % of TN removal efficiency, the HRT should be maintained higher than 4 hours (less than 0.24 g/L/d of TN loading rate). Denitrification was a rate-limiting step which controlled overall TN removal efficiency at TN loading rate of 0.15-0.31 g/L/d although nitrification efficiencies achieved 97-99 %. The effluent TSS of less than 25 mg/L in the 2SEMMC process was maintained at the SCOD loading rate of less than 1.23 g/L/d with back-washing intervals of 5 and 10 days in the anoxic and oxic EMMC reactors, respectively. The minimum HRT of 4 hours is required for high removal efficiencies of organics (average 95.6 %) and nitrogen (average 80.5 %) in the 2SEMMC process with 3 times of recirculation ratio.


2015 ◽  
Vol 8 (5) ◽  
pp. 238-243 ◽  
Author(s):  
Ezerie Henry Ezec ◽  
Shamsul Rahman Bin Mohamed Ku ◽  
Mohamed Hasnain Is ◽  
Amirhossein Malakahmad ◽  
Salihi Umar Ibrahim

2010 ◽  
Vol 113-116 ◽  
pp. 1031-1035 ◽  
Author(s):  
Yi Sun ◽  
Zi Rui Guo ◽  
Xiao Ye Liu ◽  
Yong Feng Li

In order to disscuss the ability of H2-production and wastewater treatment, a up-flow anaerobic sludge bed (UASB) using a synthesize substrate with brown sugar wastewater was conducted to investigate the hydrogen yield, hydrogen producing rate, fermentation type of biohydrogen production, and the chemical oxygen demand (COD) removal rate, respectively. In this paper, UASB reactor was seeded with sludge from the Harbin Wenchang Sewage treatment plant dewatered sludge. Successful start-up of the reactor was achieved within 40 days at 35±1°C.The concentration of chemical oxygen demand (COD) in influent is increased from 1100mg/L . When it reached maximum, the loading rate was adjusted in a small way and indicators such as VFA, pH and COD in effluent as well as gas production are observed. The most relevant parameters were calibrated with lab-scale experimental data. These experimental results clearly showed that, the most proper corresponding organic loading rate (OLR) and hydraulic retention time (HRT) were 6 kg/ (m3.d)(COD=6000mg/L)and 24 h respectively. Up to 85% of COD was removed and the CH4 production rate of 3.2 m3 / (m3 .d) was obtained. The produced biogas contained 72% of CH4. In the mean time, anaerobic sludge multiplies more faster and exiguous particles appeared. Granules with diameter 1-3mm.


Sign in / Sign up

Export Citation Format

Share Document