Determination of Optimum Partial Gear Ratios for Three-Stage Bevel Helical Gearboxes for Cost Function

Author(s):  
Nguyen Huu Quang ◽  
Tran Thi Phuong Thao ◽  
Tran Quoc Hoang ◽  
Trinh Kieu Tuan ◽  
Nguyen Dinh Ngoc ◽  
...  
Keyword(s):  
2018 ◽  
Vol 2018 ◽  
pp. 1-15 ◽  
Author(s):  
Xiaoxia Yang ◽  
Xiaoli Yang ◽  
Zhenling Wang ◽  
Yuanlei Kang

This paper proposes a cost function approach to predict the passenger distribution at the platform, which is contributed to provide services to the passenger safety and convenience and also an efficient use of the subway platform. According to the limited observation and field data collection of Beijing Xuanwumen subway station, passenger behaviors and basic attributes at the platform are analyzed. Based on the analysis and investigation, factors including the distance to the waiting area, the passenger density in the visual field, and the length of the waiting area occupied by passengers are put forward as important factors to affect the choice of the waiting area. The determination of the real-time choice defined by these factors is applied to model the passengers’ waiting area choice behaviors. Simulation experiments are run for the model calibration and validation combining with the collected field data. The results show that the passenger distribution which arises from the model is capable of keeping consistent with the actual distribution in the rough. The model is helpful for controlling how heavy carriages are congested and providing suggestions to optimize the layout of platform facilities.


2020 ◽  
Vol 164 ◽  
pp. 09039
Author(s):  
Rima Petrosyan ◽  
Alexander Mailyan

The choice of the optimal option for the production of in the construction of buildings and structures is based on a preliminary generalization and analysis of the most promising options for the implementation of construction and installation from which the most rational optimal in the is selected conditions under consideration. The purpose of the study is to determine the optimal option for production of at the convex cost function. We used the method of the determination of costs on the duration of works, represented by a convex function showing the shorter the duration of the project the more costs are required when it is reduced by the same amount. The key parameters affecting the final result of construction are the duration cost and quality of performed. Consequently, one of the main tasks is to draw up a works schedule with close coordination of the resources necessary for their implementation. To do this we have to solve problems associated with the distribution of limited resources. In this case, the technological interdependence between the works performed, which may be of a different nature, should be taken into account. As the results, new approaches were founded to developing a strategy for the selection of options for construction and installation works in order to ensure contractual deadlines for their implementation and minimize the funds spent on their implementation taking into account the nature of the dependencies between the works performed is an urgent and important problem.


1972 ◽  
Vol 10 (12) ◽  
pp. 1081-1091 ◽  
Author(s):  
Walter Welkowitz ◽  
Sylvan Fich ◽  
Joseph J. Strano

Sign in / Sign up

Export Citation Format

Share Document