The Research of RAMS Management in China’s High-Speed Railway Construction Project

Author(s):  
Jin-hui Cao
2013 ◽  
Vol 671-674 ◽  
pp. 23-26 ◽  
Author(s):  
Yan Feng ◽  
Jian Fang Li

Chengdu - Mianyang – Leshan (C-M-L for short) high speed railway in Chengdu section is located in the ground of weathered Mud rock overlying deep Chengdu clay area. Based on Chengdu clay ground of in high-speed railway construction project of CML, this article introduced the Burgers model to establish the objective function to analysis rheological constitutive model. The visco-elastic parameters of Burgers model are determined by back analysis of field monitoring data. By the method of iterative back analysis by layer of visco-elastic parameters, based on measured result, predicted the late settlement, and comparison with the follow-up observations records to verify the Burgers model.


Author(s):  
Cailan Wu ◽  
Weixiao Cui ◽  
Chengzhi Zhang ◽  
Huaijian Li ◽  
Hongliang Yan

Combining with the actual situation of China’s railway construction, this paper introduces the key technologies of design and construction of high-speed railway, such as the scheme optimization of subgrade, bridge and tunnel, technical standard, deformation control, advance geology forecast and settlement observation, etc. It also discusses the design and construction problems on the slab layout and interface of CRTS II slab track on bridge section, switch area, subgrade area and the transition with different track structures.


2011 ◽  
Vol 54 (6) ◽  
pp. 428-437 ◽  
Author(s):  
Antonella Bena ◽  
Paola Berchialla ◽  
Maria Luisa Debernardi ◽  
Osvaldo Pasqualini ◽  
Elena Farina ◽  
...  

Mechatronics ◽  
2016 ◽  
Vol 40 ◽  
pp. 167-177 ◽  
Author(s):  
Yunhua Li ◽  
Wei Liu ◽  
Liman Yang ◽  
Zhanling Ji ◽  
Yulong Zhao ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document