The impact of different governance arrangements on IT project portfolio selection outcomes – A quantitative modeling approach and simulation studies

Author(s):  
Thorsten Frey
IEEE Access ◽  
2021 ◽  
pp. 1-1
Author(s):  
Kyle Robert Harrison ◽  
Saber Elsayed ◽  
Ivan L. Garanovich ◽  
Terence Weir ◽  
Michael Galister ◽  
...  

Author(s):  
Walter J. Gutjahr ◽  
Stefan Katzensteiner ◽  
Peter Reiter ◽  
Christian Stummer ◽  
Michaela Denk

2021 ◽  
Vol 27 (2) ◽  
pp. 493-510
Author(s):  
Samaneh Zolfaghari ◽  
Seyed Meysam Mousavi ◽  
Jurgita Antuchevičienė

This paper presents a new optimization model and a new interval type-2 fuzzy solution approach for project portfolio selection and scheduling (PPSS) problem, in which split of projects and re-execution are allowable. Afterward, the approach is realized as a multi-objective optimization that maximizes total benefits of projects concerning economic concepts by considering the interest rate and time value of money and minimizes the tardiness value and total number of interruptions of chosen projects. Besides, budget and resources limitation, newfound relations are proposed to consider dependency relationships via a synergy among projects to solve PPSS problem hiring interval type-2 fuzzy sets. For validation of the model, numerical instances are provided and solved by a new extended procedure based on fuzzy optimistic and pessimistic viewpoints regarding several situations. In the end, their results are studied. The results show that it is more beneficial when projects are allowed to be split.


Sign in / Sign up

Export Citation Format

Share Document