The Process of Self-heating Sludge Incineration Based on Granular Heat Carrier

2021 ◽  
pp. 1119-1125
Author(s):  
Kong Hao ◽  
Miao Miao ◽  
Yang Hairui ◽  
Zhang Xuyi ◽  
Zhang Man
2004 ◽  
Vol 36 (11) ◽  
pp. 42-50
Author(s):  
Ludmila I. Samoilenko ◽  
Tatyana V. Ilyenko ◽  
Ludmila V. Podgorodetskaya ◽  
Ludmila N. Kolos

Author(s):  
M. Nikolishak ◽  
S. Lementar ◽  
V. Ponomarenko ◽  
R. Yakobchuk ◽  
D. Rindyuk

1992 ◽  
Vol 25 (4-5) ◽  
pp. 307-314 ◽  
Author(s):  
A. W. van der Vlies ◽  
J. H. B. te Marvelde

Recycling of sewage sludge will soon no longer be possible in The Netherlands, or will be possible only to a very limited degree. For that reason, part of the sewage sludge will have to be incinerated. This will happen particularly in those areas where tipping space is very limited. A sludge incineration plant is planned to be built in the town of Dordrecht, with a capacity of 45,000 tonnes dry solids per year. The plant will be subject to the very strict flue gas emission requirements of the Dutch Guideline on Incineration. The Guideline demands a sophisticated flue gas purification procedure.


2020 ◽  
Vol 492 (1) ◽  
pp. 57-59
Author(s):  
S. L. Bazhenov ◽  
I. V. Sosnovskii ◽  
A. S. Kechek’yan

Sign in / Sign up

Export Citation Format

Share Document