Criterions and measures of route selection of shallowly embedded long-distance oil and gas pipeline in mountain areas

2006 ◽  
Vol 11 (4) ◽  
pp. 787-792
Author(s):  
Wang Chenghua ◽  
Ma Qingwen ◽  
Kong Jiming ◽  
Chen Zefu ◽  
Li Xiuzhen
2021 ◽  
Vol 1986 (1) ◽  
pp. 012052
Author(s):  
Pengchao Chen ◽  
Rui Li ◽  
Kuan Fu ◽  
Xiaoming Zhao

Author(s):  
Zhifeng Yu ◽  
Xuejun Wang

To meet the increasing energy demand, oil and gas pipelines from Myanmar to China have been planned since 2003. After 10 years’ hard work, Myanmar-China Oil and Gas Pipeline Project had been completed by the end of 2013. The project comprises one gas pipeline and one oil pipeline. The gas pipeline with a diameter of 1016 mm and a total length of 1727 km runs through great mountain areas in the southwest of China. The oil pipeline with a diameter of 813 mm and the first phase length of 606 km is laid parallel to the gas pipeline. The challenges of this project are long distant parallel large pipelines, undulant topography with high different elevation, complicated geological condition, vulnerable ecology, etc. This paper presents some design and construction issues concerned in the project, including the route selection in mountain areas, type of crossings and its design, type of ground movements and its design, special construction methods in these areas, etc. New technologies such as GIS-based route optimization, strain-based design, longspan suspension bridges, tunnels through mountains, multiple pipelines laid in narrow or steep areas and monitoring system for seismic and fault movement had been applied to conquer the challenges.


Author(s):  
Weibin Wang ◽  
Wenqiang Tong ◽  
Zupei Yang ◽  
Muyang Ai ◽  
Hongsheng Cui ◽  
...  

The integrity management system of steel pipeline is an international popular pattern of assets management at present. It has important meaning and effect that establishing and consummating a set of assets integrity management (AIM) system with practical application value in all the integrity management system. By using the AIM system, risk can be identified and ranged timely; more detect and assess data may be gained; the maintenance and remedy cost can be saved and the monitoring become more convenient and quick. Thereby, the AIM system can contribute to dynamic and circular integrity management. According to the latest research development of integrity management in the international, this paper illustrate the assets integrity management in detail from the aspect of the application of assets integrity management, design way, workflow, and function introducing, which is based on the design module of assets integrity management.


2016 ◽  
Vol 135 ◽  
pp. 369-375 ◽  
Author(s):  
Shu-jiao Tong ◽  
Zong-zhi Wu ◽  
Ru-jun Wang ◽  
Hao Wu

Sign in / Sign up

Export Citation Format

Share Document