Regenerative scheduling problem in engineer to order manufacturing: an economic assessment
1989 ◽
Vol 40
(4)
◽
pp. 395-399
◽
Keyword(s):
2018 ◽
Vol 6
(6)
◽
pp. 221
2018 ◽
Vol E101.A
(9)
◽
pp. 1334-1343
◽