Risks Ranking in a Desalination Plant Construction Project with a Hybrid AHP, Risk Matrix, and Simulation-Based Approach

Author(s):  
Georgios K. Koulinas ◽  
Alexandros S. Xanthopoulos ◽  
Konstantinos A. Sidas ◽  
Dimitrios E. Koulouriotis
2013 ◽  
Vol 712-715 ◽  
pp. 3093-3100
Author(s):  
Xuan Guo Xu ◽  
Yun Fei Wang ◽  
Xiao Fei Li

Enterprise flexibility is a very important factor for the development of a company which facing a dynamic unpredictable market environment. Workforce flexibility has a determining effect in making a system flexible. The chemical plant construction project characteristic was analyzed, pointed out some unreasonable status of the workforce flexibility during the construction process, and presented a new way through functional and numerical flexibility analysis to optimize the workforce flexibility in an equipment installation project case. Some good advice to improve workforce flexibility is presented.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Abroon Qazi ◽  
Mecit Can Emre Simsekler

PurposeThis paper aims to develop a process for prioritizing project risks that integrates the decision-maker's risk attitude, uncertainty about risks both in terms of the associated probability and impact ratings, and correlations across risk assessments.Design/methodology/approachThis paper adopts a Monte Carlo Simulation-based approach to capture the uncertainty associated with project risks. Risks are prioritized based on their relative expected utility values. The proposed process is operationalized through a real application in the construction industry.FindingsThe proposed process helped in identifying low-probability, high-impact risks that were overlooked in the conventional risk matrix-based prioritization scheme. While considering the expected risk exposure of individual risks, none of the risks were located in the high-risk exposure zone; however, the proposed Monte Carlo Simulation-based approach revealed risks with a high probability of occurrence in the high-risk exposure zone. Using the expected utility-based approach alone in prioritizing risks may lead to ignoring few critical risks, which can only be captured through a rigorous simulation-based approach.Originality/valueMonte Carlo Simulation has been used to aggregate the risk matrix-based data and disaggregate and map the resulting risk profiles with underlying distributions. The proposed process supported risk prioritization based on the decision-maker's risk attitude and identified low-probability, high-impact risks and high-probability, high-impact risks.


Sign in / Sign up

Export Citation Format

Share Document