1976 ◽  
Vol 102 (1) ◽  
pp. 35-52
Author(s):  
Prem S. Nigam ◽  
Om P. Jain ◽  
Mahesh B. Kanchi

1974 ◽  
Vol 8 (10) ◽  
pp. 914-916
Author(s):  
I. S. Ronzhin ◽  
A. D. Osipov ◽  
V. Kh. Gol'tsman ◽  
A. B. Yumatov

2008 ◽  
pp. 101-107
Author(s):  
Dubravka Polic ◽  
Ruzica Igic ◽  
Slobodanka Stojanovic ◽  
Dejana Lazic

Labudovo okno locality (50 m-84 m elevation) is situated in the south-eastern part of the edge of the Pannonian Plains, resting along the left bank of the Danube between 1982 km and 1078 km. The investigated locality is the result of rise of the Danube level after dam building of the hydroelectric power station Djerdap I. The vegetation comprises aquatic associations of the classes Hydrochari-Lemnetea Oberd. 1967 and Potametea Tx. et Prsg. 1942. The class Hydrochari-Lemnetea Oberd. 1967 includes the following phytocoenoses: Lemno-Spirodeletum W. Koch 1954, Salvinio-Spirodeletum polyrrhizae Slavnic 1956, Lemno minoris-Azolletum filiculoides Br.-Bl. 1952, Ceratophylletum demersi (So? 27) Hild 1956. The class Potametea Tx. et Prsg. 1942 includes the associations Myriophyllo-Potametum So? 1934, Nympaeetum albo-luteae Nowinski 1928, Trapetum natantis M?lleret G?rs 1960.


2020 ◽  
Vol 223 ◽  
pp. 03002
Author(s):  
Gachenko Andrey ◽  
Hmelnov Alexey

In this work, the authors present a technology for riverside terrain model building that has been tested on a number of scientific projects to study the littoral area of tail race of the Irkutsk Hydroelectric Power Station and the Bratsk Reservoir. This model is used for forecasting changes in the reservoir shorelines associated with wastewater in the cascade of hydroelectric power stations. The technology described in the work was approved to solve a number of practical problems and showed its effectiveness. Specialized application software was developed and terrain data from various sources were used to specify and detail the end result.


2020 ◽  
Vol 11 (7-2020) ◽  
pp. 19-32
Author(s):  
Olga E. Konovalova ◽  
◽  
Nikolai M. Kuznetsov ◽  

The article tells the story of the creation of the Nizhne-Tulomskaya hydroelectric power station (HPP). The main energy parameters of the hydroelectric power station, the layoutof the main structures of the station, and archival photos of the construction time are given. Data on the production and consumption of electricity for own needs, the cost of 1 kW·h during the great Patriotic war are shown. It is told about the reconstruction and current state of the station.


Sign in / Sign up

Export Citation Format

Share Document