Choice of a long-term strategy for the national electricity supply via scenario analysis and multi-criteria analysis

1990 ◽  
Vol 48 (2) ◽  
pp. 189-203 ◽  
Author(s):  
F.A. Lootsma ◽  
P.G.M. Boonekamp ◽  
R.M. Cooke ◽  
F. Van Oostvoorn
Proceedings ◽  
2018 ◽  
Vol 1 (7) ◽  
pp. 644
Author(s):  
Eneko Arrizabalaga ◽  
Patxi Hernandez ◽  
Luis del Portillo-Valdés

2019 ◽  
Vol 15 (1) ◽  
pp. 47-61
Author(s):  
Gerald Dapaah Gyamfi ◽  
George Gyan ◽  
Mavis Ayebea ◽  
Florence Naa Norley Nortey ◽  
Prince Yaw Baidoo

Though many researchers have carried out studies on electronic government (e-government) and its effect on performance of public organizations in developed countries not much such studies have taken place in developing countries, creating a gap in literature. The current study seeks to fill the gap. The study highlights the factors affecting the implementation and sustainability of E-government and effect of the factors on performance of the driver and vehicle licensing agency (DVLA) in Ghana. The study used purposive sampling technique to gather data from the DVLA (N-50) in 2016. The outcome of the study revealed that the challenges that impede the successful implementation of e-government include regular interruption of the electricity supply, online theft, poor ICT infrastructure, and financial constraints. Based on the benefits associated with the implementation of e-government, the current researchers made recommendations for long-term sustainability of e-government.


2018 ◽  
Vol 24 (8) ◽  
pp. 1409-1428 ◽  
Author(s):  
Laurent Vandepaer ◽  
Karin Treyer ◽  
Chris Mutel ◽  
Christian Bauer ◽  
Ben Amor
Keyword(s):  

2019 ◽  
Vol 124 ◽  
pp. 04023 ◽  
Author(s):  
V. Elistratov ◽  
I. Kudryasheva

The article describes the principles of creation, management and economics of power complexes based on renewable energy sources for decentralized power supply. The introduction of energy complexes based on renewable energy sources can compete with the centralized power supply of the regions by increasing energy security and reducing the risks of major accidents and disasters. Long-term contracts for the electricity supply can be a reliable and economical insurance in case of rising fuel prices in the long term.


Subject The project to build a new nuclear power station at Hinkley Point. Significance Reports that construction of the planned nuclear power station at Hinkley Point may be postponed will raise further concerns about the project's prospects as well as the long-term direction of the UK electricity sector. The reports follow weeks of debate in the United Kingdom and France over whether construction should go ahead and over further delays in the final investment decision on the project (now scheduled for May). Impacts Depending on how the French government decides to support EDF, approval by the European Commission may be needed. The Austrian government has legally challenged the Commission's approval of UK plans to support the project. The UK government's existing plans for maintaining electricity supply -- the so-called 'capacity auctions' -- may need to be revisited.


Sign in / Sign up

Export Citation Format

Share Document