Entirely renewable energy-based electricity supply system (small scale & large scale)

1996 ◽  
Vol 9 (1-4) ◽  
pp. 913-916 ◽  
Author(s):  
A. Zahedi
2012 ◽  
Vol 8 ◽  
pp. 29-33
Author(s):  
Govind Raj Pokharel ◽  
Arjun Bahadur Chettri

Large-scale promotion of small scale decentralized renewable energy technologies to achieve a part of millennium development goal remained a great challenge until recently. However, a properly implementation of a public private partnership applied in biogas sector in Nepal has shown that scaling up of small scale renewable energy technologies is feasible if a multi-stakeholder sector development approach and favorable policy as well as modality is adopted. Nepal’s biogas program has been instrumental in helping to achieve some of the Millennium Development Goals (MDGs) by creating economic and social development opportunities in a sustainable way. Such model could also be widely replicated in any other renewable energy technologies and other continent of the world. DOI: http://dx.doi.org/10.3126/hn.v8i0.4908Hydro Nepal: Journal of Water, Energy and Environment Issue No. 8, 2011 JanuaryPage: 29-33Uploaded date: 17 June, 2011


Author(s):  
Govinda Timilsina

Large-scale deployment of renewable energy technologies, such as wind power and solar energy, has been taking place in industrialized and developing economics mainly because of various fiscal and regulatory policies. An understanding of the economy-wide impacts of those policies is an important part of an overall analysis of them. Using a perfect foresight computable general equilibrium model, this study analyzes the economy-wide costs of achieving a 10 percent share of wind power in Brazil's electricity supply mix by 2030. The study finds that the expansion of wind power would increase GDP in Brazil. The study also finds that a production subsidy financed through increased value-added tax would be superior to a consumption mandate where electricity utilities are allowed to pass the increased electricity supply costs directly to consumers. These two policies would impact various production sectors differently to achieve the wind power expansion targets.


Energies ◽  
2020 ◽  
Vol 13 (22) ◽  
pp. 5929
Author(s):  
Hyuk-Il Kwon ◽  
Yun-Sung Cho ◽  
Sang-Min Choi

Renewable energy generation capacity in Korea is expected to reach about 63.8 GW by 2030 based on calculations using values from a power plan survey (Korea’s renewable energy power generation project plan implemented in September 2017) and the “3020” implementation plan prescribed in the 8th Basic Plan for Long-Term Electricity Supply and Demand that was announced in 2017. In order for the electrical grid to accommodate this capacity, an appropriate power system reinforcement plan is critical. In this paper, a variety of scenarios are constructed involving renewable energy capacity, interconnection measures and reinforcement measures. Based on these scenarios, the impacts of large-scale renewable energy connections on the future power systems are analyzed and a reinforcement plan is proposed based on the system assessment results. First, the scenarios are categorized according to their renewable energy interconnection capacity and electricity supply and demand, from which a database is established. A dynamic model based on inverter-based resources is applied to the scenarios here. The transmission lines, high-voltage direct current and flexible alternating current transmission systems are reinforced to increase the stability and capabilities of the power systems considered here. Reinforcement measures are derived for each stage of renewable penetration based on static and dynamic analysis processes. As a result, when large-scale renewable energy has penetrated some areas in the future in Korean power systems, the most stable systems could be optimally configured by applying interconnection measure two and reinforcement measure two as described here. To verify the performance of the proposed methodology, in this paper, comprehensive tests are performed based on predicted large-scale power systems in 2026 and 2031. Database creation and simulation are performed semi-automatically here using Power System Simulator for Engineering (PSS/E) and Python.


2017 ◽  
pp. 642-656
Author(s):  
Govinda Timilsina

Large-scale deployment of renewable energy technologies, such as wind power and solar energy, has been taking place in industrialized and developing economics mainly because of various fiscal and regulatory policies. An understanding of the economy-wide impacts of those policies is an important part of an overall analysis of them. Using a perfect foresight computable general equilibrium model, this study analyzes the economy-wide costs of achieving a 10 percent share of wind power in Brazil's electricity supply mix by 2030. The study finds that the expansion of wind power would increase GDP in Brazil. The study also finds that a production subsidy financed through increased value-added tax would be superior to a consumption mandate where electricity utilities are allowed to pass the increased electricity supply costs directly to consumers. These two policies would impact various production sectors differently to achieve the wind power expansion targets.


2021 ◽  
Vol 65 (1) ◽  
pp. 12-22
Author(s):  
Silvia Cesari ◽  
Alessia Natali ◽  
Barbara Larwa ◽  
Eleonora Baccega ◽  
Elena Mainardi ◽  
...  

The current paper presents the state-of-the-art of the ongoing IDEAS research project, funded under the Horizon 2020 EU framework programme. The project involves fourteen partners from six European countries and proposes a multi-source cost-effective renewable energy system for the decarbonisation of the building envelope. The system features a radiant floor fed by a heat pump for the building thermal management. The heat pump can exploit sun, air, and/or ground as thermal sources through the use of photovoltaic/thermal solar panels, air heat exchangers, and shallow ground flat-panel heat exchangers. Thermal energy storage is achieved by means of phase change materials spread along several system components, such as: radiant floor to increase its thermal inertia, solar panels for cooling purposes, ground to enhance soil thermal capacity. Within the project framework, a small-scale building, featuring a plethora of sensors for test purposes, and two large-scale buildings are meant to be equipped with the renewable energy system proposed. The small-scale building is currently in operation, and the first results are discussed in the present work. Preliminary data suggest that while multi-source systems coupled with heat pumps are particularly effective, it is complex to obtain suitable thermal energy storages on urban scale.


2015 ◽  
pp. 93-105
Author(s):  
Panichat Kitisittichai ◽  
Ariya Aruninta

Organizations working towards standardization have defined universal standards for Best Management Practices (BMPs) for renewable energy (RE) projects. However, these universal standards are better suitedto large-scale than small-scale projects such as community renewable energy (CRE) projects. Methods used by CRE projects to achieve BMP status remain to be determined. This paper aims to present various aspects of BMPs for small-scale CRE projects by emphasizing practices that are unrestricted, simple, andadaptable to the surrounding environment, and that will eventually lead to sustainability in the commu-nity. The case study involves RE projects at the ‘Sathya Sai School Thailand,’ an education-based com-munity which has a community-like organizational management. The community implements CRE pro-jects for educational-awareness program and to serve their energy needs, starting with micro scale in the community which then will impact on the reduction of climate change crisis at global level. The methodologies used for initial assessment of the involvement of residents and stakeholders, attitude of residents towards CRE project management, and attitudes towards the benefits of CRE project management included (1) field research (i.e., field observations and key-person interviews) and (2) a preference questionnaire. The results identify strengths and weaknesses of CRE project management, and are used to evaluate whether CRE project management constitutes a BMPs by using ‘The scale and sustainability score sheet’ tool. Moreover, recommendations for CRE projects to achieve BMPs status for sustainable community RE are generated from synthesis of sustainability ratings of CRE project management and integration of BMPs theory with the gaps and weaknesses of CRE project management. In conclusion, solutions focus on ‘actual problem-based solving approach’, understanding CRE project management problems and sustained practices by community residents are at the core of BMPs. Experiences can be shared by exchanging RE knowledge among academic and professional networks, and this exchange may improve the suitability of REs in relation to dynamic changes in environmental conditions.


Humaniora ◽  
2020 ◽  
Vol 11 (1) ◽  
pp. 51
Author(s):  
Susan Susan ◽  
Dyah Kusuma Wardhani

The research aimed to comprehensively review the systems related to Building Integrated Photovoltaic (BIPV) and Building Integrated Wind Turbine (BIWT). The review purposed to observe the advantages and disadvantages of the application. Designers could use that comparison for consideration of choosing the most suitable Building Integrated Renewable Energy (BIRE) concept for projects. The research presented a literature review of BIRE systems, particularly on BIPV and BIWT systems. The critical analysis focused on some parameters related to their main energy source, type, influencing factor, efficiency, and boundary. The observation about BIPV would be divided into subgroups according to photovoltaic (PV) materials, modules, efficiency, performance’s boundaries, and the general rule of thumb of its installation. The research finds that the BIPV application has advantages in terms of the building’s application scale. It can be applied from small-scale to large-scale. Furthermore, the BIPV application does not need extra space and could directly replace the conventional building envelope materials. The issues of non-uniformity and heat transfer in BIPV can be solved by installing PV in folding-concept and placed an air gap with fins inside. On the other hand, BIWT also has an abundant energy source, but the application limits to windy areas (rural areas or urban areas in high elevation). Aside from those limitations, the BIWT application also has issues of structure, noise, and aesthetical value.


2021 ◽  
Author(s):  
Massita Ayu Cindy Putriastuti ◽  
◽  
Vivi Fitriyanti ◽  
Muhammad Razin Abdullah

• Renewable energy (RE) projects in Indonesia usually have IRR between 10% and 15% and PP around 6 to 30 years • Attractive return usually could be found in large scale RE projects, although there are numerous other factors involved including technology developments, capacity scale, power purchasing price agreements, project locations, as well as interest rates and applied incentives. • Crowdfunding (CF) has big potential to contribute to the financing of RE projects especially financing small scale RE projects. • P2P lending usually targeted short-term loans with high interest rates. Therefore, it cannot be employed as an alternative financing for RE projects in Indonesia. • Three types of CF that can be employed as an alternative for RE project funding in Indonesia. Namely, securities, reward, and donation-based CF. In addition, hybrid models such as securities-reward and reward-donation could also be explored according to the project profitability. • Several benefits offer by securities crowdfunding (SCF) compared to conventional banking and P2P lending, as follows: (1) issuer do not need to pledge assets as collateral; (2) do not require to pay instalment each month; (3) issuer share risks with investors with no obligation to cover the investor’s loss; (4) applicable for micro, small, medium, enterprises (MSMEs) with no complex requirements; and (5) there is possibility to attract investors with bring specific value. • Several challenges that need to be tackled such as the uncertainty of RE regulations; (1) issuer’s inability in managing the system and business; (2) the absence of third parties in bridging between CF platform and potential issuer from RE project owner; (3) the lack of financial literacy of the potential funders; and (4) lastly the inadequacy of study regarding potential funders in escalating the RE utilisation in Indonesia.