Identifying the critical paths and sectors for carbon transfers driven by global consumption in 2015

2022 ◽  
Vol 306 ◽  
pp. 118137
Author(s):  
Dongxiao Xu ◽  
Yan Zhang ◽  
Bin Chen ◽  
Junhong Bai ◽  
Gengyuan Liu ◽  
...  
Keyword(s):  
2020 ◽  
Vol 59 (1) ◽  
pp. 51-66
Author(s):  
Gabriel Proulx

Valérie par Valérie opens new critical paths which are fertile, though difficult to unpack. Published under the enigmatic and collective name La Rédaction, this book – whose main (or only) author seems to be Christophe Hanna – develops what we could call a viral critique, which seeks to occupy dominant ideologies to undermine them from within rather than oppose them with a new ideology. This article aims firstly to define Hanna's viral critique, based on his own theoretical works and Guy Debord's notion of spectacle as a social and economic mechanism. It then analyzes the specific form taken by that critique in Valérie par Valérie, where the author opposes the separation of literary and non-literary forms, as well as contemporary ultracapitalism and its political-economic ramifications. Finally, the ethical implications of this type of implicit critical exercise are explored through semioethics, in order to determine the efficiency of Hanna's project.


2011 ◽  
Vol 34 (2) ◽  
pp. 406-412 ◽  
Author(s):  
Zhi-Qiang XIE ◽  
Jing YANG ◽  
Yong ZHOU ◽  
Da-Li ZHANG ◽  
Guang-Yu TAN

Author(s):  
C. Metzler ◽  
A. Todri-Sanial ◽  
A. Bosio ◽  
L. Dilillo ◽  
P. Girard ◽  
...  
Keyword(s):  

2015 ◽  
Vol 23 (11) ◽  
pp. 2714-2718 ◽  
Author(s):  
Xiaobin Yuan ◽  
Pawel Owczarczyk ◽  
Alan J. Drake ◽  
Marshall D. Tiner ◽  
David T. Hui ◽  
...  

2021 ◽  
Vol 9 (1) ◽  
pp. 17-24
Author(s):  
Mia Syafrina ◽  
Fandy Bestario Harlan

Construction projects are generally the most high-risk businesses, especially shipbuilding projects. Efforts to reduce the risk can be done by minimizing the potential risk. This study aims to see potential high risk and prevent delays in the completion of ship construction using the Critical Path Method CPM at PT. XYZ. By using the Critical Path Method CPM critical paths can be given more attention so that they will not interfere ship construction projects. In addition, it is also a form of anticipation if there is a delay, it is possible to reschedule.


Sign in / Sign up

Export Citation Format

Share Document