Automatic clash correction sequence optimization using a clash dependency network

2020 ◽  
Vol 115 ◽  
pp. 103205
Author(s):  
Yuqing Hu ◽  
Daniel Castro-Lacouture ◽  
Charles M. Eastman ◽  
Shamkant B. Navathe
Procedia CIRP ◽  
2021 ◽  
Vol 96 ◽  
pp. 51-56
Author(s):  
B. Denkena ◽  
M.-A. Dittrich ◽  
S. Wilmsmeier ◽  
S.J. Settnik

2017 ◽  
Vol 11 (1) ◽  
pp. JAMDSM0001-JAMDSM0001 ◽  
Author(s):  
Lan Xuan PHUNG ◽  
Dich Van TRAN ◽  
Sinh Vinh HOANG ◽  
Son Hoanh TRUONG

2012 ◽  
Vol 616-618 ◽  
pp. 406-410
Author(s):  
Gui Liu ◽  
Hua Xing Zhang ◽  
Jin Hui Chen ◽  
Chao Gao

By making full use of the advantages of strip mining method and full-pillar mining method, the wide strip and full-pillar mining method can achieve the aim of mining under villages. However, at the full-pillar mining stage, the difficulty in managing several workfaces which are at work at the same time still exists. To improve the wide strip and full-pillar mining method’s applicability, an optimization of extraction sequence for coal pillars instead of the multi-working-face is put forward at the stage of full-pillar mining, and in the case of the deformation limit of surface structures is satisfied, to extract all the coal pillars which are under villages. By specific analysis of the extraction sequence optimization of the coal pillars in No.1 mine under Qian Xudapo village which belongs to Chang Chun coal Co., LTD., a better result is got which also acts a technological reference for the extraction under villages.


Sign in / Sign up

Export Citation Format

Share Document