scholarly journals Barriers to achieving sustainable construction project procurement in the private sector

2021 ◽  
pp. 100125
Author(s):  
Mahmoud Ershadi ◽  
Marcus Jefferies ◽  
Peter Davis ◽  
Mohammad Mojtahedi
2020 ◽  
Vol 12 (21) ◽  
pp. 8918
Author(s):  
Kyunghwan Kim

Delays by limited supply of resources are common in many construction projects and may cause serious monetary disputes between project participants. Since the dispute resolution may require unnecessary additional time and cost, preventing delays in advance is an important goal in sustainable construction project management. To prevent delays, a feasible plan must be implemented, which reflects limited resources and provides reliable activity information. For this purpose, this study proposes a generalized resource-constrained critical path method (eRCPM). It consists of three steps to identify resource-dependent activity relationships (resource links) based on the result of resource-constrained scheduling (RCS) under multiple resource constraints. Compared to the existing resource-constrained critical path methods, the eRCPM has the advantage of identifying resource links irrespective of the applied RCS technique because it is based on the result rather than the RCS process. Further, this study presents a Microsoft (MS) Excel-based half-automated prototype system that is linked using file export and import functions to both P6 and MS Project software packages. The detailed process of the eRCPM algorithm and the operation process of the prototype system are described using an example schedule. Through a case study, it was demonstrated that eRCPM appropriately identifies the necessary resource links and provides reliable total floats.


2014 ◽  
Vol 119 ◽  
pp. 456-465 ◽  
Author(s):  
Aminu Darda’u Rafindadi ◽  
Miljan Mikić ◽  
Iva Kovačić ◽  
Zoran Cekić

2019 ◽  
Vol 11 (8) ◽  
pp. 2239 ◽  
Author(s):  
Seyit Ali Erdogan ◽  
Jonas Šaparauskas ◽  
Zenonas Turskis

The article briefly discusses the content and terms of construction project management. It identifies the main problems of construction management and discusses ways to solve those using multi-criteria methods. Well-performed management is one of the critical factors which leads to the success of any significant sustainable project. Construction project management consists of setting goals and defining user requirements, project constraints, and resources needed. This paper aims to create a practically useful model. The paper presents a comprehensive set of criteria, which led to the creation of a decision-making model for construction management, which was applied to a Turkish case study. The Analytic Hierarchy Process (AHP) method and the Expert Choice computer program were used for calculations.


Sign in / Sign up

Export Citation Format

Share Document