A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity
2007 ◽
Vol 176
(3)
◽
pp. 1528-1558
◽
Keyword(s):
2015 ◽
Vol 135
(3)
◽
pp. 268-275
◽
Keyword(s):
Keyword(s):
2020 ◽
Vol 28
(2)
◽
pp. 243-250
◽
Keyword(s):
Keyword(s):
Keyword(s):
2005 ◽
Vol 23
(5)
◽
pp. 1855-1864
◽