Quasi-dynamic energy-saving judgment of electric-driven seawater source heat pump district heating system over boiler house district heating system

2010 ◽  
Vol 42 (12) ◽  
pp. 2424-2430 ◽  
Author(s):  
Shu Haiwen ◽  
Duanmu Lin ◽  
Li Xiangli ◽  
Zhu Yingxin
2007 ◽  
Vol 11 (3) ◽  
pp. 85-100
Author(s):  
Alija Lekic ◽  
Semsudin Hadziefendic

The main sources for power generation in Bosnia and Herzegovina are domestic coals, mainly lignite and brown coals, which are relatively characterized with a high content of sulphur (3-5%) and incombustibles (?30%). From the 70?s, use of this type of fuels was not allowed in the city of Sarajevo due to very unfavorable emissions to the atmosphere, during the heating period, and since then Sarajevo has been supplied with natural gas. All the heating installations in the city were reconstructed and adapted. The district heating system Toplane Sarajevo is supplied with electrical energy from the Public electrical distribution network (Elektrodistribucija Sarajevo) at low voltage (0.4 kV). The boiler-house Dobrinja III-2 (KDIII-2), from the district heating system of Sarajevo Suburb Dobrinja, which was not in use after the war 1992-1995, had a lot of advantages for the reconstruction into the co-generation plant. The Government of Canton Sarajevo financially supported this proposal. An analysis of co-generations for the district heating system and a selection of most appropriate co-generation systems were made. In the proposed conceptual design, the co-generation KDIII-2 was located in the existing boiler-house KDIII-2, connected with the heating system in Dobrinja. The operating costs of production of electricity and heat were evaluated in the study and compared with the costs of conventional energy supply to the district heating system. This analysis resulted in economic indicators, which showed that this investment was economically viable, and it also determined the payback period of the investment. In this paper results of the mentioned study and an overview of co-generation in Bosnia and Herzegovina are presented.


10.14311/212 ◽  
2001 ◽  
Vol 41 (2) ◽  
Author(s):  
G. Böszörményi ◽  
L. Böszörményi

The closure of a part of the municipal combined heat and power (CHP) plant of Košice city would result in the loss of 200 MW thermal output within a realtively short period of time. The long term development plan for the Košice district heating system concentrates on solving this problem. Taking into account the extremely high (90 %) dependence of Slovakia on imported energy sources and the desirability of reducing the emission of pollutantst the alternative of supplying of 100 MW thermal output from geothermal sources is attractive. However the indices of economic efficiency for this alternative are unsatisfactory. Cogeneration of electricity and heat in a CHP plant, the most efficient way of supplying heat to Košice at the present time. If as planned, geothermal heat is fed directly into the district heating network the efficiency would be greatly reduced. An excellent solution of this problem would be a new conception, preferring the utilization of geothermal heat in support of a combined electricity and heat production process. The efficiency of geothermal energy utilization could be increased through a special heat pump. This paper deals with several aspects of the design of a heat pump to be integrated into the system of the CHP plant.


2001 ◽  
Author(s):  
Mieczysław Dzierzgowski ◽  
Ryszard Zwierzchowski

Abstract The biomass boiler house concept in the district heating applications, both from technical and economical point of view is detailed analyzed to assure the most effective investment and future operation. This paper is concerned with the application of the Bio-fuel Boilers (BfB) as a one of perspective way of the District Heating System (DHS) modernization programs in Poland. Considering use of bio-fuels, Poland has relatively big potential particularly in bio-mass. Appropriate bio-mass technology is mainly related to the potential and supply of the bio-mass in cosidered region of the country. Usually, due to supply of bio-fuel, bio-mass fired boiler house not exceeds 30–40 MW. For the purpose of selection of appropriate type and capacity of the BfB for installation in the District Heating Plant (DHP), operational analysis of the DHS and investigation of possible implementation of the Thermal Energy Storage (TES) systems were performed. Also, investment costs for the BfB and the TES system application in the DHS were assessed. Operational analysis of the DHS covered supply and demand side i.e., heat generation by the DHP and heat consumption by the consumers. Heat consumption analysis during summer season was carried out in order to increase operational efficiency of the BfB installations and for investigation of the TES systems application in the DHS. Heat storage in the DHS and its influence on capacity and operation of the BfB was also investigated. Both, heat accumulation by the District Heating Network (DHN) and by the non-pressure TES system were analyzed. Finally, results of calculation of the required capacity of the TES systems assuring continuous and efficient operation of the BfB installation in the DHS, especially during summer season were shown. Some advantages of the TES system implementation in the DHS in case where the BfB are applied in the DHP were presented as well.


Sign in / Sign up

Export Citation Format

Share Document