Optimum operation of a novel ejector assisted flash steam cycle for better utilization of geothermal heat

2022 ◽  
Vol 253 ◽  
pp. 115164
Author(s):  
Subha Mondal ◽  
Chitta Sahana ◽  
Sudipta De
Resources ◽  
2021 ◽  
Vol 10 (4) ◽  
pp. 31
Author(s):  
Stanislav Jacko ◽  
Roman Farkašovský ◽  
Igor Ďuriška ◽  
Barbora Ščerbáková ◽  
Kristína Bátorová

The Pannonian basin is a major geothermal heat system in Central Europe. Its peripheral basin, the East Slovakian basin, is an example of a geothermal structure with a linear, directed heat flow ranging from 90 to 100 mW/m2 from west to east. However, the use of the geothermal source is limited by several critical tectono-geologic factors: (a) Tectonics, and the associated disintegration of the aquifer block by multiple deformations during the pre-Paleogene, mainly Miocene, period. The main discontinuities of NW-SE and N-S direction negatively affect the permeability of the aquifer environment. For utilization, minor NE-SW dilatation open fractures are important, which have been developed by sinistral transtension on N–S faults and accelerated normal movements to the southeast. (b) Hydrogeologically, the geothermal structure is accommodated by three water types, namely, Na-HCO3 with 10.9 g·L−1 mineralization (in the north), the Ca-Mg-HCO3 with 0.5–4.5 g·L−1 mineralization (in the west), and Na-Cl water type containing 26.8–33.4 g·L−1 mineralization (in the southwest). The chemical composition of the water is influenced by the Middle Triassic dolomite aquifer, as well as by infiltration of saline solutions and meteoric waters along with open fractures/faults. (c) Geothermally anomalous heat flow of 123–129 °C with 170 L/s total flow near the Slanské vchy volcanic chain seems to be the perspective for heat production.


Geosciences ◽  
2021 ◽  
Vol 11 (7) ◽  
pp. 271
Author(s):  
Béatrice A. Ledésert ◽  
Ronan L. Hébert ◽  
Justine Mouchot ◽  
Clio Bosia ◽  
Guillaume Ravier ◽  
...  

The Soultz-Sous-Forêts geothermal site (France) operates three deep wells for electricity production. During operation, scales precipitate within the surface installation as (Ba, Sr) sulfate and (Pb, As, Sb) sulfide types. Scales have an impact on lowering energy production and inducing specific waste management issues. Thus scaling needs to be reduced for which a thorough characterization of the scales has to be performed. The geothermal brine is produced at 160 °C and reinjected at 70 °C during normal operation. In the frame of the H2020 MEET project, a small heat exchanger was tested in order to allow higher energy production, by reinjecting the geothermal fluid at 40 °C. Samples of scales were analyzed by XRD and SEM-EDS, highlighting that mostly galena precipitates and shows various crystal shapes. These shapes can be related to the turbulence of the flow and the speed of crystal growth. Where the flow is turbulent (entrance, water box, exit), crystals grow quickly and mainly show dendritic shape. In the tubes, where the flow is laminar, crystals grow more slowly and some of them are characterized by well-developed faces leading to cubes and derived shapes. The major consequence of the temperature decrease is the increased scaling phenomenon.


2009 ◽  
Vol 34 (12) ◽  
pp. 2898-2904 ◽  
Author(s):  
Liu Jun ◽  
Zhang Xu ◽  
Gao Jun ◽  
Yang Jie

Energies ◽  
2020 ◽  
Vol 13 (10) ◽  
pp. 2473
Author(s):  
Yujiang He ◽  
Xianbiao Bu

The energy reserves in hot dry rock and hydrothermal systems are abundant in China, however, the developed resources are far below the potential estimates due to immature technology of enhanced geothermal system (EGS) and scattered resources of hydrothermal systems. To circumvent these problems and reduce the thermal resistance of rocks, here a shallow depth enhanced geothermal system (SDEGS) is proposed, which can be implemented by fracturing the hydrothermal system. We find that, the service life for SDEGS is 14 years with heat output of 4521.1 kW. To extend service life, the hybrid SDEGS and solar energy heating system is proposed with 10,000 m2 solar collectors installed to store heat into geothermal reservoir. The service life of the hybrid heating system is 35 years with geothermal heat output of 4653.78 kW. The novelty of the present work is that the hybrid heating system can solve the unstable and discontinuous problems of solar energy without building additional back-up sources or seasonal storage equipment, and the geothermal thermal output can be adjusted easily to meet the demand of building thermal loads varying with outside temperature.


Sign in / Sign up

Export Citation Format

Share Document