A New Optimization Method for Cooling Systems Considering Low-temperature Waste Heat Utilization in a Polysilicon Industry

Energy ◽  
2021 ◽  
pp. 121800
Author(s):  
Shaofei Shi ◽  
Yufei Wang ◽  
Youlei Wang ◽  
Xiao Feng
Energy Policy ◽  
2013 ◽  
Vol 62 ◽  
pp. 236-246 ◽  
Author(s):  
Hao Fang ◽  
Jianjun Xia ◽  
Kan Zhu ◽  
Yingbo Su ◽  
Yi Jiang

2017 ◽  
Vol 31 (4) ◽  
pp. 4219-4225 ◽  
Author(s):  
Yu Zhang ◽  
Jianmin Gao ◽  
Mingyue He ◽  
Dongdong Feng ◽  
Qian Du ◽  
...  

Author(s):  
Riaan de Bruyn ◽  
Ryan Hannink ◽  
Reiner Kuhr ◽  
Jan P. Van Ravenswaay ◽  
Nick Zervos ◽  
...  

The Pebble Bed Modular Reactor (PBMR), under development in South Africa, is an advanced helium-cooled graphite moderated high-temperature gas-cooled nuclear reactor. The heat output of the PBMR is primarily suited for process applications or power generation. In addition, various desalination technologies can be coupled to the PBMR to further improve the overall efficiency and economics, where suitable site opportunities exist. Several desalination application concepts were evaluated for both a cogeneration configuration as well as a waste heat utilization configuration. These options were evaluated to compare the relative economics of the different concepts and to determine the feasibility of each configuration. The cogeneration desalination configuration included multiple PBMR units producing steam for a power cycle, using a back-pressure steam turbine generator exhausting into different thermal desalination technologies. These technologies include Multi-Effect Distillation (MED), Multi-Effect Distillation with Thermal Vapor Compression (MED-TVC) as well as Multi-Stage Flash (MSF) with all making use of extraction steam from backpressure turbines. These configurations are optimized to maximize gross revenue from combined power and desalinated water sales using representative economic assumptions with a sensitivity analysis to observe the impact of varying power and water costs. Increasing turbine back pressure results in a loss of power output but a gain in water production. The desalination systems are compared as incremental investments. A standard MED process with minimal effects appears most attractive, although results are very sensitive with regards to projected power and water values. The waste heat utilization desalination configuration is based on the current 165 MWe PBMR Demonstration Power Plant (DPP) to be built for the South African utility Eskom. This demonstration plant is proposed at the Koeberg Nuclear site and utilizes a direct, single shaft recuperative Brayton Cycle with helium as working fluid. The Brayton Cycle uses a pre-cooler and inter-cooler to cool the helium before entering the low-pressure compressor (LPC) and the high-pressure compressor (HPC) respectively. The pre-cooler and intercooler rejects 218 MWt of waste heat at 73°C and 63°C, respectively. This waste heat is ideally suited for some low temperature desalination processes and can be used without negative impact on the power output and efficiency of the nuclear power plant. These low temperature processes include Low Temperature Multi-Effect Distillation (LT-MED) as well Reverse Osmosis (RO) with pre-heated water. The relative economics of these design concepts are compared as add-ons to the PBMR-DPP and the results include a net present value (NPV) study for both technologies. From this study it can be concluded that both RO as well LT-MED provide water at reasonable production rates, although a final study recommendation would be based on site and area specific requirements.


1989 ◽  
Vol 19 (3) ◽  
pp. 211-229 ◽  
Author(s):  
Robert N. Amundsen ◽  
John D. Keenan

Sign in / Sign up

Export Citation Format

Share Document