Minimizing activity exposures in project scheduling under uncertainty

2021 ◽  
Vol 173 ◽  
pp. 114635
Author(s):  
Zhiguo Wang ◽  
Tsan Sheng Ng ◽  
Chee Khiang Pang
PAMM ◽  
2017 ◽  
Vol 17 (1) ◽  
pp. 839-840
Author(s):  
Veronika Hartmann ◽  
Tom Lahmer ◽  
Kay Smarsly

2007 ◽  
Vol 10 (3) ◽  
pp. 151-152 ◽  
Author(s):  
Erik Demeulemeester ◽  
Willy Herroelen

2013 ◽  
Vol 291-294 ◽  
pp. 2889-2894
Author(s):  
Yi Kun Zhou

The buffer setting methods are useful ways to deal with the uncertainty. However, few has concern how to estimate the safe time of each project activity, which is used to set the buffer, when historic information of project is not enough. In this paper a fuzzy buffer setting method is proposed to solve the shortage. The fuzzy method has three steps: estimate the fuzzy duration, calculate the safe time and determine the buffer size. A calculation example is also given to introduce the detail procedure of this method.