Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions

2018 ◽  
Vol 181 ◽  
pp. 584-598 ◽  
Author(s):  
Jun-qing Li ◽  
Hong-yan Sang ◽  
Yu-yan Han ◽  
Cun-gang Wang ◽  
Kai-zhou Gao
2014 ◽  
Vol 1082 ◽  
pp. 529-534
Author(s):  
Zheng Ying Lin ◽  
Wei Zhang

Due to several mutual conflicting optimized objectives in the hybrid flow shop scheduling problem, its optimized model, including three objectives of make-span, flow-time and tardiness, was firstly set up, instead of the single optimized objective. Furthermore, in order to improve the optimized efficiency and parallelism, after comparing the normal multi-objective optimized methods, an improved NSGA-II algorithm with external archive strategy was proposed. Finally, taking a piston production line as example, its performance was tested. The result showed that the multi-objective optimization of hybrid flow shop scheduling based on improved NSGA-II provided managers with a set of feasible solutions for selection in accordance to their own preference. Therefore the decision could be made more scientific and efficient, and thus brings to the factory more economic benefits.


2020 ◽  
Vol 10 (3) ◽  
pp. 1174 ◽  
Author(s):  
Xuelian Pang ◽  
Haoran Xue ◽  
Ming-Lang Tseng ◽  
Ming K. Lim ◽  
Kaihua Liu

Prior studies are lacking which address permutation flow shop scheduling problems and hybrid flow shop scheduling problems together to help firms find the optimized scheduling strategy. The permutation flow shop scheduling problem and hybrid flow shop scheduling problems are important production scheduling types, which widely exist in industrial production fields. This study aimed to acquire the best scheduling strategy for making production plans. An improved fireworks algorithm is proposed to minimize the makespan in the proposed strategies. The proposed improved fireworks algorithm is compared with the fireworks algorithm, and the improvement strategies include the following: (1) A nonlinear radius is introduced and the minimum explosion amplitude is checked to avoid the waste of optimal fireworks; (2) The original Gaussian mutation operator is replaced by a hybrid operator that combines Cauchy and Gaussian mutation to improve the search ability; and (3) An elite group selection strategy is adopted to reduce the computing costs. Two instances from the permutation flow shop scheduling problem and hybrid flow shop scheduling problems were used to evaluate the improved fireworks algorithm’s performance, and the computational results demonstrate the improved fireworks algorithm’s superiority.


Mathematics ◽  
2020 ◽  
Vol 8 (10) ◽  
pp. 1661
Author(s):  
Dayong Han ◽  
Qiuhua Tang ◽  
Zikai Zhang ◽  
Zixiang Li

Steelmaking and the continuous-casting (SCC) scheduling problem is a realistic hybrid flow shop scheduling problem with continuous-casting production at the last stage. This study considers the SCC scheduling problem with diverse products, which is a vital and difficult problem in steel plants. To tackle this problem, this study first presents the mixed-integer linear programming (MILP) model to minimize the objective of makespan. Then, an improved migrating birds optimization algorithm (IMBO) is proposed to tackle this considered NP-hard problem. In the proposed IMBO, several improvements are employed to achieve the proper balance between exploration and exploitation. Specifically, a two-level decoding procedure is designed to achieve feasible solutions; the simulated annealing-based acceptance criterion is employed to ensure the diversity of the population and help the algorithm to escape from being trapped in local optima; a competitive mechanism is developed to emphasize exploitation capacity by searching around the most promising solution space. The computational experiments demonstrate that the proposed IMBO obtains competing performance and it outperforms seven other implemented algorithms in the comparative study.


Algorithms ◽  
2019 ◽  
Vol 12 (11) ◽  
pp. 222 ◽  
Author(s):  
Han ◽  
Guo ◽  
Su

The scheduling problems in mass production, manufacturing, assembly, synthesis, and transportation, as well as internet services, can partly be attributed to a hybrid flow-shop scheduling problem (HFSP). To solve the problem, a reinforcement learning (RL) method for HFSP is studied for the first time in this paper. HFSP is described and attributed to the Markov Decision Processes (MDP), for which the special states, actions, and reward function are designed. On this basis, the MDP framework is established. The Boltzmann exploration policy is adopted to trade-off the exploration and exploitation during choosing action in RL. Compared with the first-come-first-serve strategy that is frequently adopted when coding in most of the traditional intelligent algorithms, the rule in the RL method is first-come-first-choice, which is more conducive to achieving the global optimal solution. For validation, the RL method is utilized for scheduling in a metal processing workshop of an automobile engine factory. Then, the method is applied to the sortie scheduling of carrier aircraft in continuous dispatch. The results demonstrate that the machining and support scheduling obtained by this RL method are reasonable in result quality, real-time performance and complexity, indicating that this RL method is practical for HFSP.


Sign in / Sign up

Export Citation Format

Share Document