Long-term continuous and real-time in situ monitoring of Pb(II) toxic contaminants in wastewater using solid-state ion selective membrane (S-ISM) Pb and pH auto-correction assembly
2020 ◽
Vol 400
◽
pp. 123299
◽
2019 ◽
Vol 53
(6)
◽
pp. 3140-3148
◽
Keyword(s):
2014 ◽
Vol 103
(3)
◽
pp. 691-699
◽
2002 ◽
Vol 68
(11)
◽
pp. 5737-5740
◽
2010 ◽
Vol 99
(S1)
◽
pp. 241-241
◽
Keyword(s):
2018 ◽
Vol 6
(6)
◽
pp. 1701337
◽
Keyword(s):
2018 ◽
Vol 112
◽
pp. 149-155
◽