Integrated optimal allocation model for complex adaptive system of water resources management (II): Case study

2015 ◽  
Vol 531 ◽  
pp. 977-991 ◽  
Author(s):  
Yanlai Zhou ◽  
Shenglian Guo ◽  
Chong-Yu Xu ◽  
Dedi Liu ◽  
Lu Chen ◽  
...  
2012 ◽  
Vol 212-213 ◽  
pp. 536-542
Author(s):  
Qiong Su ◽  
Shi Hua He

Based on complex adaptive system theory, the characteristics of water resources allocation system of river basin are analyzed. Evolutionary mechanisms and process of complex adaptive water resources allocation system in Dianchi basin are researched, and also characteristics of "learning". A complex adaptive system model of water-resource allocation is established during analyzing the influence factors and the reaction rules of water consumer agents and water provider agents. And based on this model, water resources in Dianchi basin is allocated only under Dianchi water provider and Zhangjiu river Yunlong reservoir water provider by using the platform of matlab. Finally, corresponding calculation results and conclusions are concluded.


2017 ◽  
Vol 14 (1) ◽  
Author(s):  
Mariana Campos Fontenelle ◽  
Alexandre de Sousa Fontenelle ◽  
Yago Machado Pereira de Matos ◽  
Fernando Feitosa Monteiro

RESUMO: O presente trabalho tem a proposta de avaliar a eficácia de duas metodologias de avaliação de risco de uma barragem no Nordeste Brasileiro no intervalo de 10 anos, baseando-se na inspeção e no nível de ameaça. Utiliza-se a metodologia Nível de Perigo da Barragem (NPB) para cálculo do nível de ameaça (Fontenelle, 2007) e para o cálculo do risco as metodologias da Companhia de Gestão dos Recursos Hídricos do Ceará (COGERH) e do Conselho Nacional de Recursos Hídricos (CNRH). Observa-se que o crescente número de barragens soma-se a preocupação com a segurança destas. Face a isto, utiliza-se a avaliação de risco como forma de priorizar ações de manutenção e recuperação. O estudo de caso ocorreu na Barragem Malcozinhado, localizada no município de Cascavel, no estado do Ceará. Com base na inspeção, calcula-se o nível de ameaça e o risco, compara-se estes com os resultados de 2006. Assim, observou-se o aumento no nível de ameaça, no entanto, o risco permaneceu, em geral, baixo, semelhante aos resultados de 2006. Este resultado se deve ao fato de que o número de anomalias aumentou, porém trata-se de uma barragem jovem, de pequeno porte e inspecionada regularmente.ABSTRACT: The present study has the proposal of evaluating the effectiveness of two methodologies of risk Assessment of a Brazilian Northeast dam in a range of 10 years, based on the inspection and the level of hazard. The methodology used for calculating the hazard level is the Dam Hazard Level (NPB). In addiction, in order to evaluate the risk is used the methodology of the Water Resources Management Company of Ceará (COGERH) and the methodology of National Resources Council Water (CNRH). The number of dams is increasing with to the concern for their safety. In view of this, risk assessment is used as a tool to prioritizing maintenance and recovery actions. The case study occurred in the Malcozinhado Dam, located in the municipality of Cascavel, in the state of Ceará. Based on the inspection, the level of hazard and risk is calculated, compared to the results for 2006. Thus, the increase in the level of hazard was observed, but the risk remained generally low, similar to 2006 result. This result is due to the fact that the number of anomalies has increased, but it is a young, small and regularly inspected dam.


Water Policy ◽  
2020 ◽  
Vol 22 (1) ◽  
pp. 52-69 ◽  
Author(s):  
V. C. Goyal ◽  
Anuradha Garg ◽  
Jyoti P. Patil ◽  
T. Thomas

Abstract Integrated water resources management (IWRM) is being implemented all over the world, considering its wide area of applications and flexible spatial scale. Scientists have found IWRM useful in an Indian context also where a coordinated development of water and land resources is sought as part of complete economic, social and environmental welfare. The paper presents the concepts of ‘Local IWRM’ planning applied to water conservation and management in a case study of Ur river watershed in Tikamgarh district of Madhya Pradesh (India). The Plan considers effective utilization of land, water and other available natural resources, linked to the vulnerabilities and livelihood opportunities in the geographical area. The IWRM Plan, designed in three sections – (1) water management, (2) land management, and (3) livelihood management – provides specific suggestions on the activities under these three themes as useful inputs to the District Irrigation Plan (DIP) of the Government. The proposed IWRM Plan intends to promote the component of water demand management in district level planning and is envisioned to be an ‘implementable’ planning document for district level government. Acceptability of the IWRM plan is potentially enhanced as the plan was developed through a participatory process, wherein all relevant stakeholders were consulted at different stages of development.


Sign in / Sign up

Export Citation Format

Share Document