A novel self-healing spacer fluid for sustained casing pressure mitigation

2018 ◽  
Vol 163 ◽  
pp. 722-730 ◽  
Author(s):  
Chengyun Ma ◽  
Jingen Deng ◽  
Rui Wu ◽  
Baohua Yu ◽  
Yingcao Zhou ◽  
...  
2011 ◽  
Author(s):  
Salim Taoutaou ◽  
Jorge Andres Vargas Bermea ◽  
Pietro Bonomi ◽  
Bassam Elatrache ◽  
Christian Pasturel ◽  
...  

2021 ◽  
Author(s):  
Bipin Jain ◽  
Abhijeet Tambe ◽  
Dylan Waugh ◽  
Moises MunozRivera ◽  
Rianne Campbell

Abstract Several injection wells in Prudhoe Bay, Alaska exhibit sustained casing pressure (SCP) between the production tubing and the inner casing. The diagnostics on these wells have shown communication due to issues with casing leaks. Conventional cement systems have historically been used in coiled-tubing-delivered squeeze jobs to repair the leaks. However, even when these squeeze jobs are executed successfully, there is no guarantee in the short or long term that the annular communication is repaired. Many of these injector wells develop SCP in the range of 300-400 psi post-repair. It has been observed that the SCP development can reoccur immediately after annulus communication repair, or months to years after an injector well is put back on injection. Once SCP is developed the well cannot be operated further. A new generation of cement system was used to overcome the remedial challenge presented in these injector wells. This document provides the successful application of a specialized adaptive cement system conveyed to the problematic zone with the advantage of using coiled tubing equipment for optimum delivery of the remedial treatment.


2021 ◽  
Author(s):  
Svetlana Nafikova ◽  
Yulia Ramazanova ◽  
Alexander Muslimov ◽  
Ilshat Akhmetzianov ◽  
Bipin Jain ◽  
...  

Abstract Achieving zonal isolation for the lifetime of oil and gas wells is crucial for well integrity. Poor zonal isolation can detrimentally affect well economics and increase safety-related risks because of pressure buildup with unpredictable consequences. Additional local regulations prohibiting production of a well with positive pressure in the annulus made sustained casing pressure a major challenge for operators in the North Caspian Sea. An innovative cost-effective solution was required to resolve this challenge. Historical well analysis proved that previously applied cementing approaches were ineffective. Several modifications were required to define the effective solution. Implemented changes included revision of the casing setting depth, optimization of the drilling fluids and spacer formulations, and implementation of the self-healing expanding cement. Carefully engineered placement of the self-healing cement system was the key to success. If cracks or microannuli occur and hydrocarbons reach the cement and flow through the cracks, the system has the capability to repair itself, thus restoring integrity of the cement sheath without external intervention. This technology has been used in 11 extended reach wells in two fields with excellent results. The collaborative approach with drilling engineers eliminated the challenging sustained casing pressure issue in two major offshore fields in North Caspian Sea. In addition to the existing cementing best practices available in industry for mud removal efficiency enhancement and successful cement placement, the newly implemented methodology included potential requirements for well trajectory adjustments, implementation of the real-time control during cementing job execution, engineered placement and optimization of the self-healing expanding cement system formulation, and a specifically developed "initially required" bleedoff schedule that allows acceleration of the self-remediation cement capability. The self-healing cement was designed with low Young's modulus for maximum flexibility. Expanding additives were also incorporated into the design to minimize the risk of set cement integrity failure due to microdebonding from bulk shrinkage after setting. Adherence to the mutually developed flowchart for the drilling and cementing stages improved the zonal isolation of the critical hydrocarbon zones in the extended reach wells and increased the success ratio of the wells with no pressure buildup from 30% to almost 100% within the last 5 years. As a result, the self-healing cement technology and developed approach, which is discussed in this paper, have become the standard for both fields for all future wells. The complex engineering approach described in this paper expands the existing best practices in the industry for zonal isolation improvement of the extended reach wells and provides a new effective solution for eliminating sustained casing pressure problems. The design strategy, execution, evaluation, and results for two sample wells are discussed in detail to help to guide future engineering and operational activities around the world.


2011 ◽  
Author(s):  
Salim Taoutaou ◽  
Jorge Andres Vargas Bermea ◽  
Pietro Bonomi ◽  
Bassam Elatrache ◽  
Christian Pasturel ◽  
...  

2015 ◽  
Author(s):  
Mohammad Arif Khattak ◽  
Bipin Jain ◽  
Sultan Al Kalbani ◽  
Junaid Ahmed ◽  
Agung Arya Afrianto ◽  
...  

2019 ◽  
Author(s):  
Svetlana Nafikova ◽  
Amanmmamet Bugrayev ◽  
Salim Taoutaou ◽  
Gaygysyz Baygeldiyev ◽  
Ilshat Akhmetzianov ◽  
...  

2012 ◽  
Vol 430-432 ◽  
pp. 2067-2070
Author(s):  
Zhang Zhi ◽  
Tai Ping Xiao ◽  
Zheng Mao Chen ◽  
Tai He Shi

Currently the annulus pressure of gas well becomes more common, so the safe production of several wells has been seriously affected. The annulus pressure mechanism is relatively complex, and it can be approximately classified into annulus pressure induced by temperature effect, by ballooning effect and by leakage or seal failure etc. The article mainly focuses on the annulus pressure mechanism induced by ballooning effect and the corresponding calculation model. For the tubing column with two ends fixed and closed, when tubing internal pressure is larger than the external extrusion force, the external diameter of the tubing column balloons (i.e. ballooning effect). It reduces the annular volume between the tubing and the casing, and consequentially induces annulus pressure. Based on the fundamental theory of elastic-plastic mechanics, the tubing column is simplified into the thin walled cylinder so as to deduce the relation models between the internal pressure and its swell capacity and A annulus pressure value, which provide theoretical support for safety evaluation on annulus pressure and the next treatment program.


Sign in / Sign up

Export Citation Format

Share Document