Joint optimization of opportunistic maintenance and production scheduling considering batch production mode and varying operational conditions

2020 ◽  
Vol 202 ◽  
pp. 107047
Author(s):  
Lei Xiao ◽  
Xinghui Zhang ◽  
Junxuan Tang ◽  
Yaqin Zhou
2015 ◽  
Vol 2015 ◽  
pp. 1-9 ◽  
Author(s):  
Jianfei Ye ◽  
Huimin Ma

In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.


1995 ◽  
Vol 19 ◽  
pp. 651-656 ◽  
Author(s):  
Raimon Grau ◽  
Antonio Espuña ◽  
Luís Puigjaner

2013 ◽  
Vol 694-697 ◽  
pp. 3632-3635
Author(s):  
Dao Guo Li ◽  
Zhao Xia Chen

When solving facility layout problem for the digital workshop to optimize the production, the traditional genetic algorithm has its flaws with slow convergence speed and that the accuracy of the optimal solution is not ideal. This paper analyzes those weak points and proposed an improved genetic algorithm according to the characteristics of multi-species and variable-batch production mode. The proposed approach improved the convergence speed and the accuracy of the optimal solution. The presented model of GA also has been tested and verified by simulation.


Sign in / Sign up

Export Citation Format

Share Document