Short-term warning and integrity monitoring algorithm for coal mine shaft safety

2014 ◽  
Vol 24 (11) ◽  
pp. 3666-3673
Author(s):  
Jian WANG ◽  
Xing-long TAN ◽  
Hou-zeng HAN ◽  
T.B. AFENI
2018 ◽  
Vol 10 (6) ◽  
pp. 168781401877619 ◽  
Author(s):  
Xueen Zheng ◽  
Ye Liu ◽  
Guochao Fan ◽  
Jing Zhao ◽  
Chengdong Xu

The availability of advanced receiver autonomous integrity monitoring for vertical guidance down to altitudes of 200 ft (LPV-200) is discussed using real satellite orbit/ephemeris data collected at eight international global navigation satellite system service stations across China. Analyses were conducted for the availability of multi-constellation advanced receiver autonomous integrity monitoring and multi-fault advanced receiver autonomous integrity monitoring, and the sensitivity of availability in response to changes in error model parameters (i.e. user range accuracy, user range error, Bias-Nom and Bias-Max) was used to compute the vertical protection level. The results demonstrated that advanced receiver autonomous integrity monitoring availability based on multiple constellations met the requirements of LPV-200 despite multiple-fault detections that reduced the availability of the advanced receiver autonomous integrity monitoring algorithm; the advanced receiver autonomous integrity monitoring availability thresholds of the user range error and Bias-Nom used for accuracy were more relevant to geographic information than the user range accuracy and Bias-Max used for integrity at the eight international global navigation satellite system service stations. Finally, the possibility of using the advanced receiver autonomous integrity monitoring algorithm for a Category III navigation standard is discussed using two sets of predicted errors, revealing that the algorithm could be used in 79% of China.


2013 ◽  
Vol 5 (18) ◽  
pp. 4546-4551
Author(s):  
Jinlong Liu ◽  
Luwang Chen ◽  
Jili Wang
Keyword(s):  

2019 ◽  
Vol 2019 ◽  
pp. 1-11
Author(s):  
Jihuan Han ◽  
Jiuqun Zou ◽  
Chenchen Hu ◽  
Weihao Yang

The main shaft and auxiliary shaft in the Guotun Coal Mine underwent large deflections, with deflection values of 359 mm and 322 mm, respectively. These two deflections represent the first occurrence of such large vertical shaft deviations in the soil strata in China. The deflection problem has seriously affected the hoisting safety and lining safety and has become a serious impediment to the sustainable production of mines. Therefore, the deflection mechanism must be determined. For this purpose, based on mining subsidence theory, the spatial probability integral method and a more accurate time function were used to establish a model, called 3D dynamic prediction model, for predicting the shaft movement. The formulas for calculating the lining stress caused by coal mining were based on established models. With measured shaft deflection data, the prediction parameters for deep soil strata were calculated on the basis of an inversion analysis. A comparative analysis of measured and calculated deflection values revealed that the reason for shaft deflection in Guotun Coal Mine is the insufficient size of the protection coal pillar (PCP); namely, the design parameters of the PCP in current codes are not applicable to the deep soil strata. As a result, under the asymmetric mining conditions, mining causes the shaft to deflect without damage and under the symmetric mining conditions, mining causes the lining to fracture. The results have an extremely important significance for the prevention and control of shaft deflection, for the rational design of PCP, and for the sustainability of mine production.


Author(s):  
Feng Zhu ◽  
Gonghua Wang ◽  
Tongyu Liu ◽  
Gang Ma ◽  
Kenneth T. V. Grattan ◽  
...  

2011 ◽  
Vol 287-290 ◽  
pp. 1019-1023
Author(s):  
Jing Feng Hou ◽  
Dong Ming Guo ◽  
Hui Dong Xu ◽  
Zeng Kun Yang

This paper presents results of impermeability and frost resistance tests of a series of high strength concrete which will be used in Yuncheng coal mine shaft lining. And the shaft is one of the most difficult to construct using freezing method because of the extreme thick overburden soil. The results show the impermeability and frost resistance of the selected concrete mix proportion options can meet the special requirements of the shaft construction. It’s due to the low water-cement ratio, admixture and water-reducing agent decreases void caused by excess water. And the composite mineral admixture forms bubbles to cut off the tiny water permeable channels in cement stone. Also the filling effect and pozzolanic effect caused by fly ash contribute a lot. The research on high strength concrete used in shaft of coal mine with thick overburden soil is still rare worldwide.


2013 ◽  
Vol 765-767 ◽  
pp. 2097-2100
Author(s):  
Jun Sun ◽  
Yong Gang Yang

A dual-mode receiver combination of GPS and Compass (BD) is introduced on the assumption when only one of the satellites had a failure, how to implement a weighting RAIM monitoring. And the GPS and BD in single mode and the GPS/BD dual-mode were simulated to produce the Fault Detection Rates and RAIM integrity availability. It is demonstrated that the dual-mode RAIM algorithm is superior to any kind of single-system RAIM algorithms.


1909 ◽  
Vol 67 (1722supp) ◽  
pp. 8-8
Author(s):  
Day Allen Willey
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document